background image

IS--1627

IS--252LRJS--IEC

Revision: 0

Page 3 of 5

STEP 2B

CABLE PREPARATION FOR JACKED COPPER TAPE SHIELD CABLE

1.

Cut the cable squarely at the centerline of the bushing.

2.

Remove 8--1/2” (209mm) of the outer jacket.

3.

Remove 7” (178mm) of the copper tape shield.

4. Wrap conductive copper tape around the edge to keep

the copper tape shield in place. Install the desired

product per the manufacturer’s instructions included

with the product. Apply one wrap of mastic, as shown.

Mastic

Conductive Copper Strip

Mastic

5. Slightly flare the end of the braid with the solder block and

place it on the copper shield, flush against the cable jacket.

Solder Block

Braided Copper Wire

Flush

6. Wrap the spring coil around braid and cable two

complete turns.

Spring Coil

7.

Bend braid back over the spring and wrap the remainder

of the spring coil around the braid and cable. Hand

tighten spring coil and secure the end of the coil with

a short piece of copper tape. Be sure the solder block of

braid is centered on top of the mastic tape.

8. Apply mastic over the braid, as shown.
9. Over wrap mastic with two half--lapped layers of vinyl tape.

10. Wrap the third piece of mastic around the cable entrance

of the connector being used. Over wrap mastic with two

half--lapped layers of vinyl tape.

Mastic/Vinyl Tape

11. Remove insulation shield and insulation from the cable

end. Cut squarely taking care not to nick conductor.

12.

Position compression lug so the CONTACT THREADED

HOLE ALIGNS WITH THE BUSHING BORE. (Refer to

crimp chart packaged with compression lug for

recommended crimp tool information.) Start crimp at the

crimp line mark. Rotate 180

_

each successive crimp.

Carefully wipe excess inhibitor from the outside of the lug

and cable.

13. Remove insulation shield as shown. Bevel insulation

end 1/8” max.

14. Thoroughly clean insulation to remove all traces of dirt

or excess inhibitor.

8---1/4”

(209mm)

7”

(178mm)

Copper Tape

Jacket

Bushing Centerline

Insulation

Shield

Mastic/Vinyl Tape

2---1/8”

Start Crimp Here

Align lug thread

to bushing bore

6---7/8”

1/8

” Max.

Bevel

Insulation

Insulation Shield

Straight, Smooth & Squared

Do not cut or nick insulation

Содержание Thomas & Betts Elastimold 252LRJS-IEC

Страница 1: ...assembled product may result in its failure FOR MORE INFORMATION ON PARTS INSTALLATION RATINGS AND COMPATIBILITY CALL THE NEAREST ELASTIMOLD OFFICE Limited Warranty 1 T B warrants that its products will be free from defects in materials or workmanship for a period of two 2 years except for tools which are warranted separately seewarranty accompanying those products Fisher Pierce products and Elast...

Страница 2: ...ip of mastic if needed to build up the outer diameter in the area of the first mastic location Cover all mastic with vinyl tape 4 Remove insulation shield and insulation from the cable end Cut squarely taking care not to nick conductor 5 Wire brush bare aluminum conductors and immediately place compression lug over bushing Rotate to spread inhibitor Position compression lug so the CONTACT THREADED...

Страница 3: ...solder block of braid is centered on top of the mastic tape 8 Apply mastic over the braid as shown 9 Over wrap mastic with two half lapped layers of vinyl tape 10 Wrap the third piece of mastic around thecable entrance of the connector being used Over wrap mastic with two half lapped layers of vinyl tape Mastic Vinyl Tape 11 Remove insulation shield and insulation from the cable end Cut squarely t...

Страница 4: ...ten with wrench until wrench bends STEP 4 ASSEMBLE BAIL Place hold down bail in hold down bracket Bracket Compress Bail Insert into Brackets Bracket Optional Bail Locator STEP 5 CONCENTRIC NEUTRAL CONNECTION OR COPPER TAPE 1 Pull the hood over the concentric neutral seal area on the cable by pulling the tabs and or rolling the seal down 2 Using a separate copper wire No 14 AWG 2 5mm or equivalent ...

Страница 5: ...CTLY CONNECTED TO THE CONDUCTOR Do not use conventional voltage measuring equipment Follow the manufacturer s directions for the meter that is used Test with a suitable sensing device made for use with separable connectors manufactured with capacitive test points to determine if cable is energized Contamination moisture dirt etc around the test point or use of the wrong measuring equipment can pro...

Отзывы: