Installation and operation instruction for THF filter and 
protective unit THF 1_

The function of Protective unit (THF1_)

The protective unit shall always be used when the THF is installed in the star point on TN-C- and 
TN-S-circuits. It can also be used in TN-S-system, when THF is installed in N-conductor.

The purpose of the protection unit  is:

 to prevent harmful effects of 150/180Hz 

   fault current by measuring the current.

 to protect the network against high 

   50/ 60Hz voltage drop.

 to protect THF against overload.

The function of the protection unit

The protection unit controls the by-pass-contactor 
( K1) in case the 50/60Hz or 150/180Hz current 
exceeds  the set  level.

The factory settings:

 

 

 

150/180 Hz current: 7% of the rated primary current of current transformer ( T1).      

   

   This current can cause overheating in case of fault in the TN-S-system.

 

 Time settings 0,5 sec.

  50/60Hz current exceeds 50% of the rated primary current of current  

 

 

    

transformer (T1). This current is a cause of increased unbalance voltage.

 

Installation and operation instruction for THF filter and 
protective unit THF 1_

Connection to the network need to be done by authorised and skilled personnel only.

Содержание THF Series

Страница 1: ...or in transformer star point Care should be taken to ensure that no earth neutral bond exists on the supply transformer side of the lter This may result in a bypass situation causing excessive current...

Страница 2: ...p to protect THF against overload The function of the protection unit The protection unit controls the by pass contactor K1 in case the 50 60Hz or 150 180Hz current exceeds the set level The factory s...

Страница 3: ...4 Measure the isolation resistance between pointA and B to ensure that the resistance between point A and B is high Re needs to be over 50 k Any earthing conductor with lower resistance by passing th...

Страница 4: ...be carried out between the downstream building earth neutral to ensure that no erroneous earth neutral connection exists other than that intended to achieve a TN S system Such accidental connection c...

Страница 5: ...l wiring rules suggesting to work all power off Prior to installation of THF in the transformer star point between point A and B following measures must be taken 1 Measure the fundamental 50 60Hz curr...

Страница 6: ...Installation to TN C S System THF in the transformer star point Recommended connecting point In PEN conductor in transformer star point Care should be taken to ensure that no earth neutral bond exists...

Страница 7: ...Prior to installation of THF in N conductor of one of the TN S parts resistance measurements must be carried out between the downstream building earth neutral to ensure that no erroneous earth neutra...

Страница 8: ...rocedure see table in page 9 If the indicator lights are according to the table in page 9 the protection unit is working correctly and the THF lter can be switched on the network Current transformer K...

Страница 9: ...he indicator light functions 3 Resetting of a protective unit 4 The indicator light functions in Test actions 1 Find out the reason why a protective unit has been activated and correct the fault The r...

Страница 10: ...10 10 0 8Nm M4 1 2Nm...

Страница 11: ...11 0 8Nm M4 1 2Nm...

Страница 12: ...THF 1BS_ THF 1S_ ABB Oy P O Box 622 Telephone 358 10 224 000 FIN 65101Vaasa Telefax 358 10 224 5708 Finland Low Voltage Products Teki Prepared 04 11 17 K Kimpim ki Tarkasti Checked Hyv ksyi Approved...

Отзывы: