13
ABB i-bus
®
EIB / KNX
The commissioning of the TG/S is carried out in 2 steps:
1) Assignment of the physical address and allocation of the group addresses
using ETS.
This requires a PC with the Engineering Tool Software ETS
(from ETS2 V1.2a onwards) and an interface to the EIB
(e.g. via ABB RS232 interface EA/S 232.5). See also Chapter 5.2
2) Configuration of the users, passwords, telephone numbers,
email addresses and text.
This requires a PC with a network (LAN) connection and browser software
with active Java script (e.g. Microsoft Internet Explorer from version 5.0
onwards or similar). See also Chapter 5.3
The TG/S is supplied with the physical address 15.15.255. The IP address is
set to 192.168.0.222.
The assignment and programming of the physical address is carried out in
the usual way for EIB devices with the ETS program (from ETS2 version 1.2a
onwards).
The programming LED is supplied by the power supply unit of the
TG/S and lights up (after pressing the programming button) even with-
out being connected to the EIB. The LED can therefore not be used to
check the bus connection.
The IP (Internet Protocol) address is the unique address of the TG/S within
the local network (LAN).
In the supplied state, the IP address is set to 192.168.0.222.
The IP address can be permanently set to 192.168.0.222 in the ETS
parameter window. If the address should be changed, the setting can also
be modified directly in the TG/S via a browser.
5
Commissioning
5.1
Prerequisites
for commissioning
5.1.1 Supplied state
5.1.2 Assignment
of the physical address
5.1.3 Assignment
of the IP address
Commissioning