![ABB Terra AC Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/abb/terra-ac/terra-ac_installation-manual_346048.webp)
8
Commissioning
8.1
General commissioning procedure
Preliminary requirements
•
Mobile device
Warning: Only use this commissioning procedure for domestic use of the
EVSE and commissioning with the
TerraConfig app. For all other
methods of commissioning, do not do the commissioning. Contact your
local representative of the manufacturer. Refer to section
Procedure
1. Download the
TerraConfig app.
•
For an Android OS mobile device, go to Google Play Store.
•
For an iOS mobile device, go to Apple Store.
2. Energize the EVSE. Refer to section
3. Set up the EVSE. Refer to section
8.2
Energize the EVSE
1. Close the breaker that supplies the power to the EVSE.
Warning:
Hazardous voltage
•
Be careful when you work with electricity.
•
The power supply comes on.
•
A series of self-checks start, to make sure that the EVSE works correctly and
safely.
•
If the EVSE detects a problem, the error LED comes on.
8.3
Set up the EVSE
Preliminary requirements
•
Mobile device with the
TerraConfig app
•
Label with PIN. Refer to
.
Commissioning
48
BCM.V3Y01.0-EN | 002
Содержание Terra AC
Страница 1: ...Installation manual Terra AC Copyright ABB All rights reserved ...
Страница 36: ...Site preparation 36 BCM V3Y01 0 EN 002 ...
Страница 76: ......