![ABB Terra 180 CE Скачать руководство пользователя страница 75](http://html.mh-extra.com/html/abb/terra-180-ce/terra-180-ce_operation-and-installation-manual_3045166075.webp)
Procedure
1. Connect the Ethernet connector (A) to the Ethernet cable (B).
The Ethernet cable connection is in location (C) inside the EVSE.
5.8
Tilt sensors installation (option)
5.8.1
General procedure
For all specifications of the tilt sensors, refer to section
.
1. Install the bracket (A). Refer to section
.
2. Install the tilt sensors. Refer to section
.
3. Connect the tilt sensors.
C
B
A
A
Installation
9AKK108467A6398-EN | 002
75
Содержание Terra 180 CE
Страница 1: ...Operation and installation manual Terra 360 180 60 CE Copyright ABB All rights reserved ...
Страница 92: ...Procedure 1 Remove these parts 1 Fasteners A 2 Border covers B B A Access to parts 92 9AKK108467A6398 EN 002 ...
Страница 129: ...11 Appendix 11 1 Declaration of conformity Appendix 9AKK108467A6398 EN 002 129 ...
Страница 130: ...Appendix 130 9AKK108467A6398 EN 002 ...
Страница 134: ......