background image

Contact us

CI/R

VG200–EN

09.2013

ABB Limited

Process Automation

Howard Road

St. Neots

Cambridgeshire PE19 8EU

UK

Tel:

+44 (0)1480 475321

Fax: +44 (0)1480 217948

ABB Inc.

Process Automation

125 E. County Line Road

Warminster

PA 18974

USA

Tel:

+1 215 674 6000

Fax: +1 215 674 7183

www.abb.com

Note

We reserve the right to make technical changes or

modify the contents of this document without prior

notice. With regard to purchase orders, the agreed

particulars shall prevail. ABB does not accept any

responsibility whatsoever for potential errors or possible

lack of information in this document.

We reserve all rights in this document and in the subject

matter

and

illustrations

contained

therein.

Any

reproduction, disclosure to third parties or utilization of

its contents in whole or in parts – is forbidden without

prior written consent of ABB.

Copyright© 2013 ABB

All rights reserved

3KXR110200R4401

Содержание ScreenMaster RVG200

Страница 1: ...values and fuse requirements 4 Navigation navigating the user interface quickly and effectively 5 Menus overview menu familiarization 6 Basic setup steps required for first time use 7 Symbols and ico...

Страница 2: ...sure to isolate the supply before removing the terminal cover Normal safety precautions must be taken to avoid the possibility of an accident occurring when operating in conditions of high pressure a...

Страница 3: ...rsonal injury and or death The user should reference this instruction manual for operation and or safety information This symbol when noted on a product enclosure or barrier indicates that a risk of e...

Страница 4: ...lectrical and magnetic fields If this is not possible particularly in applications where mobile communications equipment is expected to be used screened cables within flexible earthed metal conduit mu...

Страница 5: ...e terminals accept cables from 0 8 to 2 5 mm2 18 to 14 AWG The recorder conforms to Installation Category II of IEC 61010 All connections to secondary circuits must have basic insulation After install...

Страница 6: ...e 2 neutral 3 ground or DC supply terminals 4 5 Fig 3 Accessing the recorder connection terminals Note Tighten terminal screws to a torque of 0 1 Nm 0 9 lbf in Fig 4 Power supply connections and fuse...

Страница 7: ...0 9 8 7 6 5 4 1 2 18 17 16 15 14 13 12 3 11 10 9 8 7 6 5 4 1 2 13 12 L N Tx Tx Tx Rx 3 11 10 9 8 7 6 5 4 1 2 18 17 16 15 14 13 12 Tx Rx 1 2 3 4 5 6 1 2 3 4 5 RJ45 USB Inputs 1 to 6 RTD R THC Volt free...

Страница 8: ...e 2 of 2 Display Operator menu icons page 1 of 2 Exit Operator menus return to previous view Exit display Display associated menus Access dialog Accept settings Fig 8 Navigating groups and views Swipe...

Страница 9: ...ed by pressing the icon associated with the required function Select Group Configuration Operator Message Logging Select View Historical Review Screen Interval Acknowledge Alarm Auto Group Scroll Stop...

Страница 10: ...ation based on the instrument s default configuration Configuration menu options comprise Common Groups Channels I O Functions Logic Editor Maths equations System Configuration Common Setup Number of...

Страница 11: ...nable Bar graph markers Menu enables Batch if option enabled Enable Batch Recording Start Stop Abort Operator Login Batch Number Field 1 3 Title Channels Setup Source ID Trace color Zone Filter type S...

Страница 12: ...mentation Master Modbus TCP Port Poll Rate Poll fail limit Response Timeout Client Authorization TCP TCP Client Access Authorized IP 1 6 Comms analog I P Comms analog I P Protocol Comms Digital I P Co...

Страница 13: ...ay the Group Configuration dialog Select the channel s to be assigned to each group When allocation is complete press to return to the Common Configuration level 6 4 Set up the archive files 1 Press t...

Страница 14: ...ssociated with that module 3 Configure parameters for each required module 4 When all parameters have been configured press to return to the I O page then to return to the System Configuration page 5...

Страница 15: ...ration change File deleted Archive media inserted Archive media removed Archive media offline Archive media online Archive media full System error reset archiving Daylight time or daylight saving star...

Страница 16: ...he contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility whatsoever for potential errors or possible...

Отзывы: