Checking for Gas-Tightness
The converter must be cooled down to room temperature in order to check for
gas-tightness!
Step Action
1
Connect device to mains supply.
2
Set temperature controller to room temperature.
3
Switch sample gas path to catalyst operation (lower green LED lights
up).
4
Seal sample gas outlet tightly.
5
Connect sample gas outlet with U-tube manometer or similar and
upstream stopcock.
Release air using the stopcock until the manometer displays a
pressure of approximately p
e
= 50 hPa.
6
Do not exceed the maximum operating pressure of p
abs
=
200 kPa!
7 Close
stopcock.
Checking for Gas-
Tightness
8
A leak is shown by a marked fall in pressure after several minutes.