PQFA Instructions Manual
Asea Brown Boveri Jumet S.A.
61
10. Operation
10.1. Normal working sequence
After successful commissioning (refer to chapter 9), the procedure to operate
the active filter is:
1. From the OFF position (auxiliary and main breaker open, no light on),
switch on the auxiliary breaker.
If your PQFA system has more than two modules, the auxiliary breaker of
slave cubicles should be switched on before the one of the master cubicle.
2. After 20 seconds, the system will reset.
3. The auxiliaries are then on but the main circuit breaker is still open.
The white light (ON) and the green one (OPEN) of the master cubicle are on,
while the green light (OPEN) of the slave cubicles is on.
Master cubicle lights and buttons:
Slave cubicles lights:
If your PQFA is fitted with the PQF-Manager, the red LED ‘POWER’ is on.
CLOSE
OPEN
RESET
RUN
LOC/REM
ON
CLOSE
OPEN
Содержание PQFA
Страница 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Страница 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Страница 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Страница 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Страница 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Страница 23: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 23 Auxiliary cubicle view Zoom on next page ...
Страница 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Страница 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Страница 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...