PQFA Instructions Manual
Asea Brown Boveri Jumet S.A.
41
Figure 6.8. Two independent transformers: CT connection for one
phase.
For each phase, 3 CT’s must be installed:
- one to measure I1
- one to measure I2
- one to measure I0.
Those CT’s must be identical: X/5 A.
CT I1 and CT I0 feed a summation CT which is connected to PQF1.
CT I2 and CT I0 feed a summation CT which is connected to PQF2.
Those summation CT’s must be 5+5 / 5 A.
Condition 1: the tie is open.
PQF1 sees I1 and PQF2 sees I2 (I0 = 0). The two transformers work
independently and the total current to be compensated is I1 + I2.
Condition 2: the tie is closed but both transformers feed the loads.
In this configuration, PQF1 sees (I1-I0) and PQF2 sees (I2+I0). The total
current seen by the two filters is I1 + I2.
S1, k
S2, l
P1 P2
P1 P2
S1 S2
S1, k
S2, l
S1
k
S2
l
P1 P2
P1 P2
S1 S2
I1
I2
I0
I’1-I’0
PQF 1
I’2+I’0
PQF 2
k
l
k
l
T1
T2
P2, L
P1, K
P1, K
P2, L
P1
K
P2
L
Содержание PQFA
Страница 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Страница 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Страница 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Страница 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Страница 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Страница 23: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 23 Auxiliary cubicle view Zoom on next page ...
Страница 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Страница 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Страница 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...