Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
Fig. 17: Installing the cartridge group 2
Part number
Thread and tightening torque
42099
M12x80
80 Nm
Table 8: Tightening torque (42099)
5. Fit a screw (42099) as a safeguard.
6. Remove screw (90656), nut (90415) and plates (90031).
7. Remove screws (90900) and bracket (90030).
8. Fit screws (42099). Observe the tightening torque.
9. Fit a new O-ring (42010).
Page
21
/
35
Содержание Power2 850-M16
Страница 28: ......
Страница 32: ......
Страница 42: ......
Страница 44: ......
Страница 70: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 96: ......
Страница 100: ......
Страница 130: ......
Страница 134: ......
Страница 138: ......
Страница 140: ......
Страница 142: ......
Страница 178: ......