
Operation Manual / Power2 650-M / Low-pressure stage
15 Gas piping (option) / 15.4 Storage and disposal
© Copyright 2022 ABB. All rights reserved.
HZTL4065_EN
Rev.E
March 2022
15.4
Storage and disposal
Storing gas piping
The bellows of the gas piping are made of rustproof chromium-nickel steel and can be
stored in their undamaged original packaging for an unlimited time.
They must be stored in such a way that mechanical damage to the parts can be excluded.
See also main chapter 4 (Operation Manual / Power2 650-M / Product description)
Disposing of gas piping components
See main chapter 4 (Operation Manual / Power2 650-M / Product description)
15.5
Spare parts
15.5.1
Ordering spare parts
Please quote the following data when making queries and ordering spare parts:
¡
Serial number of Power2 (HT……)
¡
Serial number of the low or high-pressure stage (PT……)
¡
Designation and part number.
Spare parts can be ordered from a Turbo Systems service station.
u
If different model variants are not taken into account in this document, contact a Turbo
Systems service station.
Customer spare part set (97150) required to inspect the gas piping
For the operations described in the Operation Manual, the customer spare part set (97150)
is required. These parts are only available in the complete set.
Part number
Designation
Quantity
51011
Hexagon-head screw
3
51012
Verbus Ripp® Washer
3
51013
Hexagon nut
3
61007
Metal C-ring
1
61050
Gasket
1
85002
Metal C-ring
1
Table 70: Customer spare part set (97150)
Page
115
/
119