QUICK START GUIDE 

Order Codes  Descriptions 

CC109142980 

QS873A Thermal Probe 

CC848817024 

B  10’ controller to thermal probe wireset 

CC109157434 

B  20’ controller to thermal probe wireset 

CC848822560  C  1’ thermal probe to thermal probe wireset 
848719803 

C  5’ thermal probe to thermal probe wireset 

CC848822321 

C  10’ thermal probe to thermal probe wireset 

Order Codes  Descriptions 

108958422 

ES771A Voltage Monitor Card 

CC848791517 

D  2 ½’ ES771A to probe wireset 

CC848797290  D  6’ ES771A to probe wireset 
848719829 

D  10’ ES771A to probe wireset 

CC848791500  G  4’ ES771A to ES771A or controller wireset 

848652947 

G  10’ ES771A to ES771A or controller wireset 

Information: Controller Connections

 

Alarm Outputs 
Alarm  relays  are  factory  set  to  Open  On 

Alarm. If Close On Alarm is desired adjust 

controller  alarm  jumpers.  See  diagram  in 

step  5  for  the  location  of  the  controller 

alarm  jumpers.  Connector  J4  provides 

access  to  the  primary  customer  alarm 

outputs. J4 is a 20-pin latching connector.  

Alarm Output Cables 

CC848890137 

5 ft. 

CC109157442 

15ft 

CC848817635 

50 ft 

CC848817643 

150 ft 

Standard Controller Alarm Output    

Defaults 

Pin 

Color 

Option 1 

Color 

Option 

PCR 

Power Critical 

BL 

BL 

PCR_C 

Power Critical_C 

11 

BL/BK 

PMJ 

Power Major 

PMJ_C 

Power Major_C 

12 

O/BK 

PMN 

Power Minor 

PMN_C 

Power Minor_C 

13 

G/BK 

R1 

Battery On Discharge 

BR 

R1_C 

Battery On Discharge_C (BD_C) 

14 

W/BK 

R2 

Very Low Voltage (VLV) 

BK 

R2_C 

Very Low Voltage_C (VLV_C) 

15 

BK/W 

R3 

Fuse Alarm Major (FAJ) 

BL 

BL/W 

R3_C 

Fuse Alarm Major_C (FAJ_C) 

16 

BL/R 

R4 

AC Fail (ACF) 

O/R 

R4_C 

AC Fail_C (ACF_C) 

17 

R5 

Rectifier Fail (RFA) 

G/W 

R5_C 

Rectifier Fail_C (RFA_C) 

18 

R/G 

R6 

Mult. Rectifier Fail (MRFA) 

BR 

W/R 

R6_C 

Mult. Rectifier Fail_C (MRFA_C) 

19 

R/W 

R7 

High Voltage (HV) 

10 

BK/R 

R7_C 

High Voltage_C (HV_C) 

20 

R/BK 

Information: Battery Monitoring Connections - cables

 

Temperature Measurement 

Temperature and Voltage Measurement 

Alarm Inputs 
Default  alarm  descriptions  may  be 

changed  as  needed  using  web  pages  or 

Easyview2.  

J3 is a 10-pin latching connector. 

Standard Controller Alarm Input Defaults 

J3 Pin 

Color  

Air Con Fail 

BK 

Air Con Fail_Return 

Door Open 

BR 

Door Open_Return 

Aux PMJ Input 

Battery Test/GSTR 

Battery Test_Return 

EPO 

EPO_Return 

10 

Hi ext. Temp. 

Hi ext. Temp._Return 

Low ext. Temp. 

BL 

Low ext. Temp._Return 

Alarm Input Cables 

CC848890153 

5 ft. 

CC848865980 

15ft 

CC848817651 

50 ft 

CC848817668 

150 ft 

Содержание NES48-23-AC1-PS4-DC1E-LVBD

Страница 1: ...ew Drivers Screw Drivers 1 Flat 2 Phillips Wire cutters and strippers Read and follow all safety statements and precautions in this guide NES48 23 AC1 PS4 DC1E LVBD 19 23 wide AC input AC1 Molex AC2 IEC 3 20 C 19 AC5H Term Block AC6 3 phase delta Term Block 19 only AC7 3 phase delta wye Term Block 19 only of Power Slots of Distribution Panels LVBD option Step 1 Mount the System Mount the system wi...

Страница 2: ... 23 AWG max Strip Wire mm Torque In lb Nm AC1 Molex mini fit SR 2 Yes 8 n a AC3 IEC 320 C19 1 Yes Yes 12 n a AC5 Terminal Block 1 Yes Yes 10 10 7 0 75 AC6 Terminal Block 3 phase Delta 3 Yes 6 12 16 1 75 AC7 Terminal Block 3 phase Wye 3 Yes 6 12 16 1 75 Information Rectifier Options Rectifier Input DC Output Recommended AC Breaker 3 phase Volts amps AC1 2 rects per feed AC3 AC5 AC6 AC7 NE050ECO48AT...

Страница 3: ...ion is selectable between battery input or load output Breaker sizes up to 250A TPS fuses to 70A and GMT fuses to 12A are available Lug Landings Distribution Battery Bus Landings 1 4 20 studs on 5 8 centers Lug tongue width 0 68 max 5 16 18 studs on 1 centers Torque 65 in lb 7 16 socket 160 in lb 1 2 socket Two multi pole adapters are required for each multi pole breaker see illustration right Mul...

Страница 4: ...il the faceplate releases and swings outward 3 Slide the rectifier into the slot until it engages with the back of the shelf Swing the faceplate closed to fully seat the rectifier Verify the faceplate is latched 4 Correct insertion of the rectifier will automatically add the unit to the controllers inventory of units Step 6 Set Controller Jumpers Connect per site engineering instructions Pulsar Pl...

Страница 5: ...ve High Voltage Shutdown 50 to 60V 58 50 58 50 58 50 High Float Voltage Major Alarm 50 to 60V 57 00 57 00 57 00 High Float Voltage Minor Alarm 50 to 60V 56 00 56 00 56 00 Rectifier System Float Voltage 42 to 56 5V 54 48 52 08 54 40 Battery on Discharge Float Alarm 46 to 55V 51 00 50 00 51 00 Very Low Float Voltage Alarm 40 to 51V 46 00 46 00 46 00 Rectifier On Threshold 40 to 51V 44 00 44 00 44 00...

Страница 6: ...put Defaults Pin Color Option 1 Color Option 2 PCR Power Critical 1 BL BL PCR_C Power Critical_C 11 W BL BK PMJ Power Major 2 O O PMJ_C Power Major_C 12 W O BK PMN Power Minor 3 G G PMN_C Power Minor_C 13 W G BK R1 Battery On Discharge 4 BR W R1_C Battery On Discharge_C BD_C 14 W W BK R2 Very Low Voltage VLV 5 S BK R2_C Very Low Voltage_C VLV_C 15 W BK W R3 Fuse Alarm Major FAJ 6 BL BL W R3_C Fuse...

Страница 7: ...n Normal Amber Minor Alarm Red Critical Major Alarm Some alarms may occur during initial installation eg thermal probe fail or Major Minor communication fail Clear these alarms Via Controller Display follow the menu path Menu Control Operation Clear Events or Uninstall Equipment Verify Basic Installation Settings Date Time Battery Type number of strings and float voltage Menu Configuration System ...

Страница 8: ... a standard ethernet cable Use a standard web browser to access the controller web pages at default IP address 192 168 2 1 Warning Do not connect LAN port to a network when set to Server mode Set the controller LAN port to Client or Static before connecting to the network Static is the factory default setting and the typical setting for most networks Once connected to the controller web server a l...

Страница 9: ...l and local rules and regulations when making field connections Compression Connectors U S or Canada installations use Listed Certified compression connectors to terminate Listed Certified field wire conductors All installations apply the appropriate connector to the correct size conductor as specified by the connector manufacturer using only the connector manufacturer s recommended or approved to...

Страница 10: ...are and follow all safety warnings and practices when servicing this equipment Hazardous energy and voltages are present in the unit and on the interface cables that can shock or cause serious injury When equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only pro...

Страница 11: ...reserved QUICK START GUIDE Version Date Description of the change 9 0 04 07 2021 Updated as per template and added new pictures 10 0 05 26 2022 Corrected labeling in figure on page 1 Change History excludes grammar clarifications ...

Страница 12: ... reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2020 ABB All rights reserved We reserve the right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility wh...

Отзывы: