QUICK START GUIDE 

Step 4 - Connect Batteries and DC 

Output to Loads 

The  figure  to  the  right  shows  the  DC  circuit  of 

the system. 
Battery connections may be made to bullet-style 

distribution  positions  configured  as  Battery 

Breaker Positions or direct to the battery bus. 

Caution:  

Verify battery voltage and polarity with a 

voltmeter before connecting. 
Load  connections  are  made  to  bullet-style 

distribution  positions  configured  as  Load 

Breaker Positions. 
Distribution  panels  are  each  equipped  with  20 

(19”  panel)  or  26  (23”  panel)  bullet-style 

distribution positions. Each position is selectable 

between battery input or load output.  
Breaker  sizes  up  to  250A,  TPS  fuses  to  70A  and 

GMT fuses to 12A are available.

 

Lug Landings 

 

 

Distribution 

Battery Bus 

Landings 

1/4-20 studs on 5/8” centers 

Lug tongue width 0.68” max 

5/16-18 studs on 1”       

centers

 

 

Torque 

65 in-lb - 7/16” socket

 

 

160 in-lb - 1/2” socket

 

 

Two multi-pole adapters are required for each multi-pole breaker - see illustration, right 

Multi-Pole Adapter Kits - 2 required per breaker 

 

CC848756916 

850021775 

850021955 

Poles 

Lug Landings 

1/4” x 5/8”

 

 

3/8” x 1”

 

 

3/8” x 1”

 

 

Protector 

Alarm Pin (up) 

+24V Protector 

Note Orientation 

-48V Protector positions 

Blue Terminals 

Lower positions 

+24V Protector positions 

Orange Terminals 

Upper positions 

-48V Protector 

Note Orientation 

Protector Alarm Pin (up) 

Load Bus 

Return Bus 

Orange 

+24 VDC Bus 

Blue 

-48 VDC Bus 

Содержание NES48-23-AC1-PS4-DC1E-LVBD

Страница 1: ...ew Drivers Screw Drivers 1 Flat 2 Phillips Wire cutters and strippers Read and follow all safety statements and precautions in this guide NES48 23 AC1 PS4 DC1E LVBD 19 23 wide AC input AC1 Molex AC2 IEC 3 20 C 19 AC5H Term Block AC6 3 phase delta Term Block 19 only AC7 3 phase delta wye Term Block 19 only of Power Slots of Distribution Panels LVBD option Step 1 Mount the System Mount the system wi...

Страница 2: ... 23 AWG max Strip Wire mm Torque In lb Nm AC1 Molex mini fit SR 2 Yes 8 n a AC3 IEC 320 C19 1 Yes Yes 12 n a AC5 Terminal Block 1 Yes Yes 10 10 7 0 75 AC6 Terminal Block 3 phase Delta 3 Yes 6 12 16 1 75 AC7 Terminal Block 3 phase Wye 3 Yes 6 12 16 1 75 Information Rectifier Options Rectifier Input DC Output Recommended AC Breaker 3 phase Volts amps AC1 2 rects per feed AC3 AC5 AC6 AC7 NE050ECO48AT...

Страница 3: ...ion is selectable between battery input or load output Breaker sizes up to 250A TPS fuses to 70A and GMT fuses to 12A are available Lug Landings Distribution Battery Bus Landings 1 4 20 studs on 5 8 centers Lug tongue width 0 68 max 5 16 18 studs on 1 centers Torque 65 in lb 7 16 socket 160 in lb 1 2 socket Two multi pole adapters are required for each multi pole breaker see illustration right Mul...

Страница 4: ...il the faceplate releases and swings outward 3 Slide the rectifier into the slot until it engages with the back of the shelf Swing the faceplate closed to fully seat the rectifier Verify the faceplate is latched 4 Correct insertion of the rectifier will automatically add the unit to the controllers inventory of units Step 6 Set Controller Jumpers Connect per site engineering instructions Pulsar Pl...

Страница 5: ...ve High Voltage Shutdown 50 to 60V 58 50 58 50 58 50 High Float Voltage Major Alarm 50 to 60V 57 00 57 00 57 00 High Float Voltage Minor Alarm 50 to 60V 56 00 56 00 56 00 Rectifier System Float Voltage 42 to 56 5V 54 48 52 08 54 40 Battery on Discharge Float Alarm 46 to 55V 51 00 50 00 51 00 Very Low Float Voltage Alarm 40 to 51V 46 00 46 00 46 00 Rectifier On Threshold 40 to 51V 44 00 44 00 44 00...

Страница 6: ...put Defaults Pin Color Option 1 Color Option 2 PCR Power Critical 1 BL BL PCR_C Power Critical_C 11 W BL BK PMJ Power Major 2 O O PMJ_C Power Major_C 12 W O BK PMN Power Minor 3 G G PMN_C Power Minor_C 13 W G BK R1 Battery On Discharge 4 BR W R1_C Battery On Discharge_C BD_C 14 W W BK R2 Very Low Voltage VLV 5 S BK R2_C Very Low Voltage_C VLV_C 15 W BK W R3 Fuse Alarm Major FAJ 6 BL BL W R3_C Fuse...

Страница 7: ...n Normal Amber Minor Alarm Red Critical Major Alarm Some alarms may occur during initial installation eg thermal probe fail or Major Minor communication fail Clear these alarms Via Controller Display follow the menu path Menu Control Operation Clear Events or Uninstall Equipment Verify Basic Installation Settings Date Time Battery Type number of strings and float voltage Menu Configuration System ...

Страница 8: ... a standard ethernet cable Use a standard web browser to access the controller web pages at default IP address 192 168 2 1 Warning Do not connect LAN port to a network when set to Server mode Set the controller LAN port to Client or Static before connecting to the network Static is the factory default setting and the typical setting for most networks Once connected to the controller web server a l...

Страница 9: ...l and local rules and regulations when making field connections Compression Connectors U S or Canada installations use Listed Certified compression connectors to terminate Listed Certified field wire conductors All installations apply the appropriate connector to the correct size conductor as specified by the connector manufacturer using only the connector manufacturer s recommended or approved to...

Страница 10: ...are and follow all safety warnings and practices when servicing this equipment Hazardous energy and voltages are present in the unit and on the interface cables that can shock or cause serious injury When equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only pro...

Страница 11: ...reserved QUICK START GUIDE Version Date Description of the change 9 0 04 07 2021 Updated as per template and added new pictures 10 0 05 26 2022 Corrected labeling in figure on page 1 Change History excludes grammar clarifications ...

Страница 12: ... reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2020 ABB All rights reserved We reserve the right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility wh...

Отзывы: