background image

Page 10

 

© 2021 ABB. All rights reserved.

 

 

Quick Start Guide

 

Alarm Reset

 

Information: Clear Breaker Alarm

 

The Alarm Card monitors all breakers that were once ON. 

 

Breaker Alarms occur while breakers are OFF or TRIPPED. 

 

Clear Breaker Alarm 

 

Turn the breaker ON 

 

or 

 

Press the Alarm Reset button to ignore all breakers that are OFF or TRIPPED, until they

 

Information: Rectifier Options

 

Rectifier

 

Input

 

Output 48Vdc

 

Recommended 3

-

phase AC Breaker (PH

-

N) 

WYE

 

1

-

shelf

 

(3 rectifiers)

 

AC Breaker/Wire Gauge

 

1

-

shelf

 

(3 rectifiers)

 

AC Breaker/Wire Gauge

 

Eco Rectifier

 

 

blue

 

 

 

NE050ECO48ATEZ

 

 

 

ac  200

-

277 Vac

 

 

 

50A

 

 

 

20A /12 AWG

 

 

 

40A / 8 AWG

 

Rectifier

 

 

blue

 

NE075AC48ATEZ

 

ac  200

-

277 Vac

 

75A

 

30A / 10 AWG

 

50A / 8 AWG

 

NE050AC48ATEZ

 

ac  208

-

277 Vac

 

50A

 

20A / 12 AWG

 

40A / 8 AWG

 

Surge Protectors

 

Force During insert to 
module to the base

 

Information: Surge Protectors

 

Surge Protection Device consists of three RU

-

320

-

25 field

-

replaceable modules protecting Line to Neutral and 

one RU

-

180

-

25 field 

-

replaceable module protecting Neutral to Ground. See page11 for ordering replacement 

module information.

 

Replace pluggable modules if RED indicator tab is visible on any of the multiple pole units. To remove:

 

 

1.

 

Verify that you have the correct replacement module.

 

 

2.

 

Disconnect power.

 

 

3.

 

Pull the pluggable module from the base.

 

 

4.

 

Push a new pluggable module into the base. You will hear a 

click

”, 

indicating that the module is set in place. An 

insertion 

key

” 

built into the unit will help ensure that the module has been correctly selected.

 

CAUTION : Use of 

 

excessive ion, can 

result in damage

 

L1

 

L2

 

L3

 

Red Indicator 

 

Window

 

N

 

Содержание NES48-19-4U-AC7-PS3-DIN15B250P-LVBD-ACSPD

Страница 1: ...trippers Cable crimpers Step 1 Mount System Prepare the system for mounting to the frame 1 Reposition mounting ears if required may be moved back up to 5 Torque to 2 8 Nm 25 in lb Phillips screwdriver Mount the system to the frame 1 Attach system to frame using minimum of eight screws four per side 12 24 screws provided Mounting Ears Inter Shelf Bracket Rectifier Shelf Step 2 Ground Chassis Attach...

Страница 2: ...necting to AC mains follow all local and national wiring rules Caution When routing AC ensure cables do not come in contact with sharp or rough surfaces that may damage insulation and cause a short circuit 1 Remove AC Cover four screws back left of unit 2 Connect AC conduit Remove knockout for 1 conduit either on side or bottom of box 3 Connect Conduit Ground Wire 6 mm2 8 AWG Lug landing is M6 on ...

Страница 3: ...Connect Fastons to breaker terminals Terminal 11 Red Terminal 12 Black 2 Mount breaker to DIN rail a Verify that breaker is OFF handle down b Fully open the screw connections at breaker bottom 2 Phillips c Slide breaker over bus tabs and engage top DIN rail fully IMPORTANT Verify top DIN rail engagement d Tighten the breaker bottom connection 2 Phillips 3 Connect alarm wires to Alarm Card HDR3 BAT...

Страница 4: ... only note positions of priority critical versus non priority non critical loads There can be up to 6 priority and 9 non priority loads 1 Verify that breaker is OFF handle down 2 Mount breaker to DIN rail a Fully open the connection at breaker bottom 2 Phillips b Slide breaker over bus tab and fully engage top DIN rail IMPORTANT Verify top DIN rail engagement a Tighten the breaker bottom connectio...

Страница 5: ...Mark each connected circuit identification on the ID label ID Label Example Step 8 Connect Controller Cables For additional details see Steps 11 and 12 for controller information and Information Sections on battery monitoring and alarm connections 1 Connect LAN 10Base T Ethernet Communication 2 Connect 1 Wire Battery Monitoring Cables 3 Connect alarm input and output cables Alarm Relay Jumpers LAN...

Страница 6: ...m the factory defaults via a Controller Display b Craft Port on front of controller using a laptop with EasyView2 software or HyperTerminal EasyView2 GUI software can be downloaded from www abbpowerconversion com c J5 LAN port web pages using a laptop with browser LAN port Server mode is for local laptop connection Set the LAN port to Server With the controller set to Server enter the default IP a...

Страница 7: ...cation fail Clear these alarms Via Controller Display follow the menu path Menu Control Operation Clear Events or Uninstall Equipment Via web pages or EasyView2 Select the Maintenance tab clear latched events and clear missing devices Verify Basic Installation Settings Date Time Battery Type number of strings and float voltage Controller Display Menu Configuration System Settings and Menu Configur...

Страница 8: ... QS873B Ambient Probe CC848817024 B 10 controller to thermal probe wireset CC109157434 B 20 controller to thermal probe wireset CC848822560 C 1 thermal probe to thermal probe wireset 848719803 C 5 thermal probe to thermal probe wireset 850037334 C 20 thermal probe to thermal probe wireset Ordering Codes Descriptions 108958422 ES771A Voltage Monitor Card CC848791517 D 2 ES771A to probe wireset CC84...

Страница 9: ...W R3_C Fuse Alarm Major_C FAJ_C 16 R BL R R4 AC Fail ACF 7 O Q R R4_C AC Fail_C ACF_C 17 R R R5 Rectifier Fail RFA 8 G G W R5_C Rectifier Fail_C RFA_C 18 R R G R6 Mult Rectifier Fail MRFA 9 BR W R R6_C Mult Rectifier Fail_C MRFA_C 19 R R W R7 High Voltage HV 10 S BK R R7_C High Voltage_C HV_C 20 R R BK Standard Controller Alarm Output Defaults Pin Color Option 1 Color Option 2 PCR Power Critical 1...

Страница 10: ...AC48ATEZ ac 208 277 Vac 50A 20A 12 AWG 40A 8 AWG Surge Protectors Force During insert to module to the base Information Surge Protectors Surge Protection Device consists of three RU 320 25 field replaceable modules protecting Line to Neutral and one RU 180 25 field replaceable module protecting Neutral to Ground See page11 for ordering replacement module information Replace pluggable modules if RE...

Страница 11: ...ied by the connector manufacturer using only the connector manufacturer s recommended or approved tooling for that connector Electrical Connection Securing Torque to the values specified on labels or in the product documentation Cable Dress dress to avoid damage to the conductors and undue stress on the connectors Circuit Breakers and Fuses Use only those specified in the equipment ordering guide ...

Страница 12: ...ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only properly insulated tools Remove all metallic objects key chains glasses rings watches or other jewelry Follow Lock Out Tag Out LOTO procedures customer specified site specific or general as appropriate Disconnect all power...

Страница 13: ...Page 13 2021 ABB All rights reserved Quick Start Guide NOTE ...

Страница 14: ...ial errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2021 ABB All rights reserved ABB 601 Shiloh Rd Plano TX USA abbpowerconversion com...

Отзывы: