At least twice yearly, perform a thorough inspection of the switchgear.
Emphasize the following checks:
1.
Perform an overall visual inspection.
2.
Check all indicators, meters, and instruments for proper operation.
3.
Make sure all bolted panels are secure.
4.
Verify operation of heaters and thermostats, if used.
5.
Check for undue noise or vibration that might loosen bolted
connections.
6.
Look for evidence of moisture in the switchgear.
Содержание K-Line Plus
Страница 2: ......
Страница 4: ......
Страница 5: ......
Страница 7: ......
Страница 9: ...K L i n e P l u s 2 ...
Страница 15: ...K L i n e P l u s 8 ...
Страница 30: ...K L i n e P l u s 23 Torque the inch bus hardware to 30 45 foot pounds ...
Страница 36: ......
Страница 37: ...K L i n e P l u s 30 Figure 20 Lifting eyes with anchor plates Lifting eye Anchor Plate ...
Страница 39: ...K L i n e P l u s 32 ...
Страница 47: ...K L i n e P l u s 40 ...
Страница 53: ...K L i n e P l u s 46 ...
Страница 61: ...K L I N E P L U S ...
Страница 64: ...K L I N E P L U S ...