K - L i n e
P l u s
11
2.
Raise the unit enough to position a roller under the shipping base.
Repeat the operation at the other end. See Figure 2
Figure 2. Raise the unit enough to position a roller under the shipping
base.
3.
Push the switchgear toward its final position, while another person
puts a third roller under the forward end. Keep moving a roller
from the rear to the front until the unit is in place.
4.
For lateral moving, raise the units by jacks as described in step 1.
Place the rollers laterally with steel channels (not furnished) on the
rollers. See Figure 3 and
Error! Reference source not found.
.
Carefully push the unit onto a third roller and move a roller from
the rear to the front until the unit is in place.
Содержание K-Line Plus
Страница 2: ......
Страница 4: ......
Страница 5: ......
Страница 7: ......
Страница 9: ...K L i n e P l u s 2 ...
Страница 15: ...K L i n e P l u s 8 ...
Страница 30: ...K L i n e P l u s 23 Torque the inch bus hardware to 30 45 foot pounds ...
Страница 36: ......
Страница 37: ...K L i n e P l u s 30 Figure 20 Lifting eyes with anchor plates Lifting eye Anchor Plate ...
Страница 39: ...K L i n e P l u s 32 ...
Страница 47: ...K L i n e P l u s 40 ...
Страница 53: ...K L i n e P l u s 46 ...
Страница 61: ...K L I N E P L U S ...
Страница 64: ...K L I N E P L U S ...