Operation Manual / TPS48-D/E.. - TPS61-D/E..
Safety
2
Safe operation and maintenance
2.6
Page 23
© Copyright 2016 ABB. All rights reserved.
Sept
em
ber
2016
H
ZT
L2410_
EN
R
ev
is
ion
E
Safety during start-up / commissioning and operation
Before starting work, carry out visual inspection of working area.
Remove any obstacles and objects lying around.
Before start-up / commissioning, check all pipes from and to turbo-
charger for damage and leaks.
Don't work in any way that could impair safety when working on turbo-
charger.
After about every 12 hours of operation or at least once a day, inspect
turbocharger for visible damage and defects.
Immediately report any damage or changes in operational perfor-
mance to person responsible.
If damage is discovered, immediately shut down turbocharger and se-
cure it against inadvertent or unauthorized use.
When switching on auxiliary power sources (hydraulics, pneumatics,
electricity, water), keep an eye open for any hazards resulting from
supplying these power sources.
Safety during cleaning
If cleaning agents or solvents are used for cleaning, the corresponding
material safety data sheet and the safety instructions in section "Hazards
due to operating and auxiliary materials" must be observed.
Observe the material safety data sheet for the cleaning agent or sol-
vent.
Wear personal protective equipment (PPE) according to the material
safety data sheet.
Inspect the electric cables for abrasion and damage before and after
your cleaning work.