ABB Turbocharger VTC..4
Seite / Page 29
Demontage und Montage
Kap. / Chap. 5
Disassembly and assembly
ABB Turbo Systems Ltd
HZTL 10104
- D -
ABB
5.3 Removing
the turbine end bearing
- Bend up the locking discs (42024) (see fig. 5-11/1).
- Remove hex.-headed screws (42023).
- With 3 hex.-headed screws (42023) pull out the co-
ver plate (34001) and the sealing cover with gasket
ring (34002) from the bearing casing (42000).
- If necessary, clean the threaded holes in the co-
ver plate (34001) and press off the cover with 3
screws.
- Remove the socket screws (42021).
- Pull out the bearing (34100) from the bearing
casing (42000) by using three socket screws
(42021).
- Remove the socket screws (34104) from the bea-
ring housing (34101) and take away the end disc
(34102) and the floating bush (34103) (see fig.
5-11/2).
Note
Inspection and assessement of bearing
condition (see sec. 5.4).
Caution !
Protect removed parts from dirt.
5.3 Turbinenseitiges
Lager ausbauen
- Sicherungsscheiben (42024) aufbiegen (s. Fig.
5-11/1).
- 6kt-Schrauben (42023) entfernen.
- Abschlussdeckel (34001) und Dichtungsdeckel mit
Dichtring (34002) mit drei 6kt-Schrauben (42023)
aus dem Lagergehäuse (42000) herausziehen.
- Wenn notwendig, Gewindelöcher im Abschluss-
deckel (34001) säubern und Deckel mit 3 Schrau-
ben heraus-pressen.
- Zylinderschrauben (42021) entfernen.
- Lager (34100) mit 3 Zylinderschrauben (42021)
aus dem Lagergehäuse (42000) herausziehen.
- Zylinderschrauben (34104) aus dem Lagerkör-
per (34101) entfernen, Endscheibe (34102) und
Schwimmbüchse (34103) abnehmen (s. Fig.
5-11/2).
Hinweis
Kontrolle und Beurteilung der Lager
(s. Abschn. 5.4).
Vorsicht !
Ausgebaute Teile vor Verschmutzung
schützen.
Содержание HT842648
Страница 4: ......
Страница 5: ...0 Preliminary remarks Vorbemerkungen ...
Страница 6: ......
Страница 18: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise ...
Страница 19: ......
Страница 33: ......
Страница 34: ...2 Putting into operation Inbetriebnehmen ...
Страница 35: ......
Страница 52: ...3 Operation and maintenance Betrieb und Unterhalt ...
Страница 53: ......
Страница 90: ...Troubleshooting Beheben von Störungen 4 ...
Страница 91: ......
Страница 98: ...Disassembly and assembly Demontage und Montage 5 ...
Страница 99: ......
Страница 149: ......
Страница 150: ...Taking out of operation Ausserbetriebnehmen 6 ...
Страница 151: ......
Страница 161: ......
Страница 162: ...Appendix Anhang 7 ...
Страница 163: ......
Страница 165: ...10109 ABB Turbo Systems Ltd C Seite Page 2 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix ...
Страница 168: ...ABB Turbo Systems Ltd 10109 C ABB Turbocharger VTC 4 Seite Page 5 Anhang Kap Chap 7 Appendix Notizen Notes ...
Страница 208: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB ...