Operation Manual / TPL76-C
5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2018 . All rights reserved.
HZTL2485_EN
Revision F
April 2018
5.3.1
Wet cleaning with orifice plate on filter silencer (XC2)
Operating state prerequisites for wet cleaning XC2
WARNING
Increased stress on material
During cleaning of the compressor at an engine load of 85 to 100 %, the
stress on the material of the compressor-end turbocharger parts can
be increased.
u
No personnel is allowed to be present in the vicinity of the tur-
bocharger during compressor cleaning.
u
Compressor cleaning must be activated from the engine control
panel.
Wet cleaning procedure for compressor with XC2
u
Trigger water injection according to the specifications of the en-
ginebuilder.
u
The specified water pressure upstream of the connection to the tur-
bocharger must be maintained.
u
Operate engine for at least five additional minutes after cleaning.
Not more than three cleaning cycles should be conducted consecutively.
Cleaning parameters per turbocharger compressor
Product Engine load Water pres-
sure
[bar]
Water
injection time
[sec]
Water
temper-
ature
[°C]
Ø orifice
[mm]
TPL76-C
50 … 100%
3
10
5 … 50
2.9
Page
51
/
133