Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 63
Apr
il 20
15
H
ZT
L24
12_
EN
R
ev
is
ion E
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
Conditions
short
water injection time
long
water injection time
Engine load (guide value)
20 … 40 %
Turbine inlet temperature
T
TE
before water injection
350 … 400 °C
350 … 430 °C
Water supply
ensured
Water pressure
(overpressure over
atmosphere) p
WT
2.0 bar
1.5 bar
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.
© Copyright 2015 ABB. All rights reserved.