Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
5
Cleaning the compressor during
operation
5.3
Page 56
Sept
em
be
r 2
014
H
ZT
L24
98_
EN
R
ev
is
ion A
Wet cleaning with orifice plate on filter silencer (XC2)
Operating state prerequisites for cleaning compressor with XC2
NOTICE
To be able to carry out a satisfactory cleaning process that has been
tested and is recommended by ABB Turbo Systems, the following
prerequisites must be fulfilled:
Engine load 50 … 85%
Start cleaning cycle according to following description in Wet
cleaning operation with XC2.
Compressor wet cleaning operation with XC2
Maintain water pressure before connection to turbocharger (during
water injection time) as shown in table Cleaning parameters .
After cleaning, wait at least 5 minutes to allow turbocharger to dry.
NOTICE
If cleaning process is not satisfactory, it may be repeated up to 2 times.
If the cleaning process is still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an ABB Turbocharging
service station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Water
pressure
[bar]
water injection time
[sec]
Orifice
diameter
[mm]
TPL65-A32/33/36 50 …85%
3
10
2.1
TPL69-A32/33
2.5