C O M M I S S I O N I N G
24
FOX61x
LEDE1
6.1
Commissioning of an E1 port
6.1.1
Prerequisites
Before starting the commissioning of a E1 port on the LEDE1 unit, the follow-
ing prerequisites need to be fulfilled:
6.1.1.1
CESM1 unit
In a FOX61x, a CESM1 needs to be in operation in slot 11 of the FOX61x
subrack,
6.1.1.2
LEDE1 unit
In a FOX615, the LEDE1 service unit is inserted into one of the following
slots:
−
slot 1 … 10,
−
slot 12 … 21.
For the installation of the unit, please refer to
In a FOX612, the LEDE1 service unit is inserted into one of the following
slots:
−
slot 7 … 10,
−
slot 12 … 14.
For the installation of the unit, refer to
"1KHW002462 FOX612 Installation"
A valid ESW is installed on the LEDE1 unit. For the management of ESW,
refer to
. For details about compatible
ESW versions, refer to
"1KHW002459 FOX61x Release Notes"
.
FOXCST needs to be installed on a PC, and a management connection from
the FOXCST to the FOX61x needs to be up and running. For details about
the installation and operation of the FOXCST, please refer to
The amount and accessibility of operations depend on the user profile with
which you are logged in. For more information, please refer to
.
6.1.1.3
PETS
The PETS on the FOX61x network element must be configured to an appro-
priate synchronization clock source, i.e. a clock source traceable to a PRC.
For the PETS configuration refer to
"1KHW002467 FOX61x TDM Services"
6.1.2
Configuration of an E1 port
For the configuration of the E1 port, the following steps have to be per-
formed.
Содержание FOX61 Series
Страница 1: ...ABB Power Systems FOX61x LEDE1 User Manual ...
Страница 6: ...6 FOX61x LEDE1 ...
Страница 8: ...8 FOX61x LEDE1 ...
Страница 30: ...O P E R A T I O N A N D M A I N T E N A N C E 30 FOX61x LEDE1 ...
Страница 50: ...A N N E X 50 FOX61x LEDE1 ...
Страница 51: ......