Mounting
SM/FEX300/FEX500/FM/CSA-EN
FEX300, FEX500
EN - 19
4.7 Electrical
connection
Electrical connection should be performed by following the information in the operating
instructions OI/FEX300/FEX500 or the commissioning instructions CI/ FEX300/FEX500.
According to NEC standards, the separate ground connection between flowmeter sensor and
transmitter can be established as follows:
1.
Route the steel wire (1) in the signal cable under the clip.
2.
Fit the steel wire (1) with protective tubing and wire end sleeve (2).
3.
Connect to the grounding connection (3).
Dual compartment housing
Single compartment housing
Fig. 12
G00
7
60
-
0
1
1
2
3
1
2
3
1
Содержание FEX300
Страница 2: ......
Страница 43: ...Appendix SM FEX300 FEX500 FM CSA EN FEX300 FEX500 EN 41 9 2 Installation drawing HART IDM 10 A0258...
Страница 44: ...Appendix 42 EN FEX300 FEX500 SM FEX300 FEX500 FM CSA EN...
Страница 46: ...Appendix 44 EN FEX300 FEX500 SM FEX300 FEX500 FM CSA EN...
Страница 47: ......