Endura AZ series integral and remote transmitter
Combustion oxygen monitor
6 Calibration
66
IM/AZ20E–EN Rev. F
…Calibration Procedures
Waiting for Application of Test Gas (2
nd
Point)
Note
. The test gas used for this stage of the calibration is always Test
Gas 2.
Manu
al Cal – 2
-Pt
• Close test gas
valve
• Return to
Sensor Cal.
• Continue
calibration
procedure
• Close test gas
valve
• Return to
Sensor / Cal.
•
Calibration In Progress (2
nd
Point)
Note
. The test gas used for this stage of the procedure is always test
gas 2.
Test gas detection is monitored and, if no test gas is detected, the
calibration fails. Otherwise the test gas valve is opened and the
procedure continues (not applicable if the
Test Gas Type
is
Process
Air
).
Test Gas Response Time monitored – if no response to the
application of the test gas is detected, the test gas valve is closed and
the calibration fails.
At this point the calibration procedure remains idle while the test gas
delay timer runs (AutoCal only).
Oxygen value is monitored for stability, if the stability criteria are not
met, the test gas valve is closed and the calibration fails.
Once the stability criteria have been met a cell impedance check is
performed and the test gas valve is closed.
Once the stability criteria have been met, a cell impedance check is
performed, the test gas valve is closed and, finally, the process values
are collated with those retained following the 1
st
-point calibration
stage and the calibration coefficients (
Offset
and
Factor
) are
re-calculated.
If either or both of the new coefficients are outside the permitted limits
(defined by
Offset Limit
and
Factor Limit
calibration fails and a
calibration entry is added to the
Performance Log.
2-Pt
Aut
o
Cal
Man
u
al Cal –
2-Pt
<Cal Type>
Connect Test Gas 2
Air
1.00 %O2
Abort
Continue
<Cal Type>
O2
1.00 % O2
Abort
Settling-Please Wait