
22
ABB
ARC GUARD SYSTEM™ – CSU-2LV/2MV INSTALLATION AND MAINTENANCE GUIDE
Mounting and connecting the CSU-2 to the system
This is a summary of the complete procedure in mounting
and connecting the CSU-2.
WARNING
Make sure that the supply voltage is switched
off before mounting and connecting the CSU-2!
To mount and connect the CSU-2 do the following steps:
1.
Connect optical cables (option) to current sensing
units before this unit in the chain to input (1).
“Connecting optical cables” on page 23.
2.
Connect an optical cable to arc monitor or next
CSU-2 to outputs (2 and/or 3).
3.
Connect electrical connections.
electrical connections” on page 23.
4.
Place and mount the current sensors. This
installation guide contains examples for placing the
sensors and information on how to mount.
See: “Mount current sensors” on page 24.
5.
Connect current sensors to the CSU-2.
6.
Supply the system with power.
7.
Go through the Start-Up sequence in Human
Machine Interface, HMI.
8.
Controlling the current sensors and the system.
See: “4.3.2 Controlling” on page 28.
04
Содержание CSU-2LV
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 12: ......
Страница 17: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 17 03 ...
Страница 18: ......
Страница 29: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 29 04 ...
Страница 30: ......
Страница 38: ......
Страница 66: ...66 ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 06 ...
Страница 67: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 67 07 7 Maintenance 68 7 1 Introduction ...
Страница 69: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 69 07 ...
Страница 70: ......
Страница 75: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 75 08 ...
Страница 76: ......
Страница 83: ...ABB ARC GUARD SYSTEM CSU 2LV 2MV INSTALLATION AND MAINTENANCE GUIDE 83 09 ...