Product Specifications
ABB, 1SBC159103M0201
13
3.5 Power Supply and Wiring
CP430 must use the power supply with 24 V DC and the power consumption
is 20W.
Perform the following steps to wire the power connector:
1. Unplug the power connector and unscrew the screws.
2. Strip approximately 1 cm of insulation. Insert the wire all the way into the
power connector and then turn the screws tight.
3. Plug in the connector to the power outlet of the operator terminal.
Warning:
To avoid an electrical shock, be sure to switch off the power before connecting the
communication/download cable to the operator terminal.
Note:
The power connector is already plugged into the power outlet of operator termi-
nal when the package is first opened.
MA00824B_MAEN859.book Page 13 Tuesday, June 5, 2007 10:34 AM