
Field and Software Tools
CalMaster2 and CheckMaster
3 Installation
IM/VCM2
Issue 6
11
3.2.2 Connecting a MagMaster to a CalMaster2
To test a MagMaster refer to see Section 4, page 20.
Fig. 3.4 Fitting Communications Leads
Fig. 3.5 Fitting Transmitter Leads
Fig. 3.6 Fitting Sensor Leads
ALARM 1 F OUT A ALARM 2 F OUT B PLS OV PLS OV EXT I/P+ EXT I/P- TX- SIG RX- SIG TX+ SIG RX+ SIG OVC
N
+ L
1 2 3
Yellow 12
Red 11
Red 12
Yellow 12
Red 1
Yellow 1
Connect the
communication lead
to the appropriate
terminals:
FOUTA= Red
FOUTB= Blue
PLS0V= Black
IC+= Yellow
IC-= Green
1 2 3
ALARM 1 F OUT A ALARM 2 F OUT B PLS OV PLS OV EXT I/P+ EXT I/P- TX- SIG RX- SIG TX+ SIG RX+ SIG OVC
N
+ L
Yellow 2
1 2 3
ALARM 1 F OUT A ALARM 2 F OUT B PLS OV PLS OV EXT I/P+ EXT I/P- TX- SIG RX- SIG TX+ SIG RX+ SIG OVC
N
+ L
Yellow 3
Содержание CalMaster2
Страница 1: ...Instruction Manual IM VCM2 Issue 6 Field and Software Tools CalMaster2 and CheckMaster ...
Страница 49: ...Field and Software Tools CalMaster2 and CheckMaster Notes IM VCM2 Issue 6 47 Notes ...
Страница 50: ...Field and Software Tools CalMaster2 and CheckMaster Notes 48 IM VCM2 Issue 6 ...