Electrical installation 99
Connecting the power cables and busbars
The circuit diagrams in this section are templates for the final main circuit diagrams. They
do not contain details, such as terminal markings, etc. and are not suitable for the
installation work as such. The designer of the cabinet-installed drive must:
•
prepare the final circuit diagrams
•
provide the final circuit diagrams to the installer(s).
The electricians that do the connections must use the final circuit diagrams.
Connection diagram – 1×D8T, 6-pulse
1)
Fuses or other protection means.
2)
Ground the cable shield 360 degrees at the cable lead-through (recommendation). See section
on page
3)
Use a separate PE conductor in addition to the input cable shield if the conductivity of the shield does not
meet the requirement for the PE conductor. See
Electrical planning instructions for ACS880 multidrive cabinets
and modules
(3AUA0000102324 [English]).
4)
The supply modules and other components connect to the cabinet grounding point [PE] via their mounting
bases and frame of the cabinet. Make sure that there are good electrical contacts (bare metal to metal, no
paint or dirt). Use separate grounding wires in addition where necessary. See section
on page
Notes:
For the cable selection instructions, see
Electrical planning instructions for ACS880 multidrive cabinets and
modules
(3AUA0000102324 [English]).
6+
;° <
<° =
=
°
2 2 2
1)
2)
3)
4)
Содержание ACS880-304 +A018
Страница 1: ...ABB industrial drives Hardware manual ACS880 304 A018 diode supply modules ...
Страница 4: ......
Страница 14: ...14 ...
Страница 52: ...52 Cabinet construction Kits for 2 D7T 12 pulse Rittal TS 8 ...
Страница 53: ...Cabinet construction 53 Stage 1 Installation of common parts ...
Страница 54: ...54 Cabinet construction Stage 2 Module installation parts ...
Страница 55: ...Cabinet construction 55 Stage 3 Module installation ...
Страница 56: ...56 Cabinet construction Stage 4 AC busbars to the module ...
Страница 57: ...Cabinet construction 57 Stage 5 DC busbars to the module ...
Страница 58: ...58 Cabinet construction Stage 6 Shroud installation ...
Страница 60: ...60 Cabinet construction Kits for 1 D8T 6 pulse Rittal TS 8 ...
Страница 61: ...Cabinet construction 61 Stage 1 Installation of common parts ...
Страница 62: ...62 Cabinet construction Stage 2 Module installation parts ...
Страница 63: ...Cabinet construction 63 Stage 3 Quick connector installation ...
Страница 64: ...64 Cabinet construction Stage 4 DC busbars to the module ...
Страница 65: ...Cabinet construction 65 Stage 5 AC busbars to quick connector ...
Страница 66: ...66 Cabinet construction Stage 6 AC busbar ...
Страница 67: ...Cabinet construction 67 Stage 7 Module installation ...
Страница 68: ...68 Cabinet construction Stage 8 Shroud installation ...
Страница 70: ...70 Cabinet construction Kits for 1 D8T 6 pulse generic cabinet ...
Страница 72: ...72 Cabinet construction Kits for 2 D8T 6 pulse Rittal TS 8 ...
Страница 73: ...Cabinet construction 73 Stage 1 Installation of common parts ...
Страница 74: ...74 Cabinet construction Stage 2 Module installation parts ...
Страница 75: ...Cabinet construction 75 Stage 3 Quick connector installation ...
Страница 76: ...76 Cabinet construction Stage 4 DC busbars ...
Страница 77: ...Cabinet construction 77 Stage 5 AC busbars to quick connector ...
Страница 78: ...78 Cabinet construction Stage 6 AC fuse busbars installation ...
Страница 79: ...Cabinet construction 79 Stage 7 Module installation ...
Страница 80: ...80 Cabinet construction Stage 8 Shroud installation ...
Страница 82: ...82 Cabinet construction Kits for 2 D8T 6 and 12 pulse generic cabinet ...
Страница 84: ...84 Cabinet construction Kits for 2 D8T 12 pulse Rittal TS 8 ...
Страница 85: ...Cabinet construction 85 Stage 1 Installation of common parts ...
Страница 86: ...86 Cabinet construction Stage 2 Module installation parts ...
Страница 87: ...Cabinet construction 87 Stage 3 Quick connectors ...
Страница 88: ...88 Cabinet construction Stage 4 DC busbar installation ...
Страница 89: ...Cabinet construction 89 Stage 5 AC busbars to quick connector ...
Страница 90: ...90 Cabinet construction Stage 6 AC busbars to main AC installation ...
Страница 91: ...Cabinet construction 91 Stage 7 Module installation DC connection flanges ...
Страница 92: ...92 Cabinet construction Stage 8 Shroud installation ...
Страница 94: ...94 Cabinet construction Kits for 3 D8T 6 pulse generic cabinet ...
Страница 104: ...104 Electrical installation 3 b a 5 A cable lead through example This is to be acquired by the cabinet installer ...
Страница 118: ...118 Start up ...
Страница 125: ...Maintenance 125 2 3 ...
Страница 127: ...Maintenance 127 2 3 ...
Страница 132: ...132 Maintenance 4 5 6 7 8 6 10 10 ...
Страница 140: ...140 Maintenance 5 a c b 6 d e 9 ...
Страница 144: ...144 Maintenance 6 b c 7 d 8 ...
Страница 214: ...214 Ordering information ...
Страница 240: ...240 Dimension drawings Dimensions of D7T supply module ...
Страница 241: ...Dimension drawings 241 Dimensions of D8T supply module ...
Страница 242: ...242 Dimension drawings Dimensions of quick connector for D8T module Dimensions in mm 1 mm 0 0394 in ...
Страница 243: ...Dimension drawings 243 Dimensions of the pull out ramp for D8T module Dimensions in mm 1 mm 0 0394 in ...
Страница 244: ...244 Dimension drawings Dimensions of BCU control unit ...
Страница 247: ...Dimension drawings 247 Dimensions of OT2000E12 IEC www abb com Dimensions in mm 1 mm 0 0394 in OT2000E12 ...
Страница 255: ...Dimension drawings 255 Miscellaneous components CRBB 4 400 188 cooling fan 218 Dimensions in mm 1 mm 0 0394 in ...
Страница 256: ...256 Dimension drawings RFI filter and related accessories RFI filter Dimensions in mm 1 mm 0 0394 in ...
Страница 257: ...Dimension drawings 257 Oval toroid kit ...
Страница 258: ...258 Dimension drawings Oval toroid ...
Страница 259: ...Dimension drawings 259 Dimensions of CVAR board UL CSA Dimensions in mm 1 mm 0 0394 in ...
Страница 260: ...260 Dimension drawings ...
Страница 280: ...www abb com drives www abb com drivespartners 3AXD50000010104 Rev C EN 2015 12 03 Contact us ...