Control cable installation examples

11.  Install optional modules, if included in the delivery
12.  Install the cover(s)

1.7 N·m 

R3

R8

R6

1.7 N·m (15 lbf·in) 

2 N·m (1.5 lbf·ft)

 2 N·m 

 2 N·m

2 N·m (1.5 lbf·ft)

1

2

1

2

IP21 (UL Type 1),

 

R3

IP55 (UL type 12), R3

IP21 (UL type 1), R6, R8

IP55 (UL type 12),

R6, R8

2 N·m (17 lbf·in)

2

1

4

3

2 N·m (17 lbf·in)

2 N·m (17 lbf·in)

Содержание ACQ580-31 Series

Страница 1: ...ive when a rotating permanent magnet motor is connected to it A rotating permanent magnet motor energizes the drive including its input and output terminals Make sure that debris from drilling cutting...

Страница 2: ...pair cable for analog signals Use double shielded or single shielded cable for the digital relay and I O signals Do not run 24 V and 115 230 V signals in the same cable Protect the drive and input pow...

Страница 3: ...creases the insulation resistance If you think that there is moisture dry the motor and do the measurement again Frame Symmetrically grounded TN S systems center grounded wye Corner grounded delta and...

Страница 4: ...l area of the PE conductor is less than 10 mm2 Cu or 16 mm2 Al For example you can use the cable shield in addition to the fourth conductor PE PE L1 L2 L3 UDC U1 W1 M 3 T1 U T2 V T3 W V1 PE PE L1 L2 L...

Страница 5: ...strated in the applicable figure 3c Slide the cables through the holes in the cable entry and attach the grommets to the holes 4 Connect the power cables For the tightening torques refer to Terminal d...

Страница 6: ...ound the motor cable shield at the motor end For minimum radio frequency interference ground the motor cable shield 360 degrees at the cable entry of the motor terminal box 4b 4c 2 9 N m 2 9 N m 2 N m...

Страница 7: ...SCR1 terminal 3 Tie all control cables to the provided cable tie mounts Default I O connections Water default Total load capacity of the auxiliary voltage output 24V X2 10 is 6 0 W 250 mA 24 V DC Term...

Страница 8: ...cluded in the delivery 12 Install the cover s 1 7 N m R3 R8 R6 1 7 N m 15 lbf in 2 N m 1 5 lbf ft 2 N m 2 N m 2 N m 1 5 lbf ft 1 2 1 2 IP21 UL Type 1 R3 IP55 UL type 12 R3 IP21 UL type 1 R6 R8 IP55 UL...

Страница 9: ...cable shield and connect them to the grounding terminals Ground the shield 360 degrees at the grounding clamp If you use discrete conductors connect the insulated ground conductor to the ground termin...

Страница 10: ...Home screen press Menu to enter the Main Menu 5 In the Main menu go to Parameters Complete list 95 HW configuration pressing Select repeatedly to select parameter 95 01 6 In parameter 95 01 Supply vol...

Страница 11: ...Communication control Refresh settings Validates any changed EFB configuration settings Use this after changing any parameters in group 58 58 14 Communication loss action 58 17 Transmit delay 58 28 EF...

Страница 12: ...hree current carrying conductors in raceway or cable or earth directly buried For other conditions size the cables according to local safety regulations appropriate input voltage and the load current...

Страница 13: ...14 321 023A 4 R3 17 0 23 0 23 0 15 JJS 35 10 473 027A 4 R6 24 27 27 20 JJS 40 8 625 034A 4 R6 29 34 34 25 JJS 50 8 711 044A 4 R6 34 44 44 30 JJS 60 6 807 052A 4 R6 44 52 52 40 JJS 80 4 960 065A 4 R6...

Страница 14: ...ides all other functions of the drive Wiring The safety contacts must open close within 200 ms of each other Double shielded twisted pair cable is recommended for the connection The maximum length of...

Страница 15: ...fety function is used for safety component functionality Adjustable speed electrical power drive systems Part 5 2 Safety requirements Functional Safety of machinery Functional safety of safety related...

Отзывы: