![ABB ACH550-UH HVAC Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/abb/ach550-uh-hvac/ach550-uh-hvac_user-manual_3045265015.webp)
ACH550-UH User’s Manual
1-15
Installation
Note:
Frame sizes R7 and R8 have
mounting holes inside the enclosure base.
See
on page
.
Where it is not possible to use either
mounting hole at the back of the base, use
an L-bracket at the top of the enclosure to
secure the cabinet to a wall or to the back of
another enclosure. Bolt the L-bracket to the
enclosure using the lifting lug bolt hole on
the top of the enclosure.
2. Drill holes of appropriate size in the
mounting location.
PC00023
Fastening points when installed
back against a wall (Top view)
Fastening points when installed
back against back
Cabinet top
M12 bolt (1/2 to 9/16 in)
L-bracket
Fastening the cabinet at the top
using L-brackets (side view)
Содержание ACH550-UH HVAC
Страница 2: ......
Страница 8: ...1 8 ACH550 UH User s Manual Table of contents ...
Страница 32: ...1 32 ACH550 UH User s Manual Installation ...
Страница 66: ...1 66 ACH550 UH User s Manual Application macros ...
Страница 186: ...1 186 ACH550 UH User s Manual Parameters ...
Страница 190: ...1 190 ACH550 UH User s Manual Embedded fieldbus Preferred wiring diagram Alternate wiring diagram ...
Страница 333: ...ACH550 UH User s Manual 1 333 Technical data ...