2
Installation Instructions ACF-NT, ACF-NT V0309
42/23-571 EN Rev. 5
Contents
Page
Foreword
Important Safety Information
Safety Tips for Handling Electronic Measurement Devices
Safety Tips for Handling the FTIR Spectrometer
Safety Tips for Handling the VOC Analyzer
Safety Tips for Handling Harmful Gases
Special Information about the System Design for Measurement of HF
Chapter 1
Installation Preparation
Installation Site Requirements
Gas Supply Requirements
Power Supply Requirements
Analyzer System Features Relevant for Installation
Items Delivered
Materials Needed for Installation (not supplied)
Chapter 2
Analyzer System Installation
Installing the Analyzer System
Installing the Analyzer Cabinet
Installing the Gas Sampling Probe and Filter Unit
Installing the Sample Gas Line
Installing the Instrument Air and Test Gas Supply
Connecting the Electrical Leads
Appendix
Analyzer System Components
Layout Plan: Exterior View
Layout Plan: Interior View
Piping Plan
Connection Plan: Power Supply
Connection Plan: Signal Leads