
Section 4 Commissioning of PROFIBUS equipment Special conditions regarding the installation of
3BDS009029R5001 B
97
equipotential bonding line must be laid, if possible, in parallel to the data line
(e.g.: 16 mm²). Under no circumstances, the line shield must be used as
compensating line.
•
Laying of the PROFIBUS cable in separate grid ducts to energy lines. If bus
cables and energy lines are laid in parallel, a minimum distance of 30 cm is
provided.
The lines provided for the energy line (e.g. for converter actuators) are screened
with a copper braiding. PROFIBUS International (PI) stipulates that the bus
cable has additionally to be laid in a steel tube or in a tight sheet metal channel
in case of extreme interference influencing. The tube or the channel must be
earthed regularly and protected against corrosion (see also PROFIBUS
installation Guideline).
•
The grounding of field cable screens for wiring remote I/O housings with the
field devices must be carried out in conformity with the requirements of the
remote I/O suppliers.
Содержание AC 800M
Страница 1: ...Power and productivity for a better worldTM AC 800M PROFIBUS DP Installation System Version 5 0 5 1...
Страница 2: ......
Страница 3: ...AC 800M PROFIBUS DP Installation System Version 5 0 5 1...
Страница 8: ...Table of Contents 8 3BDS009029R5001 B...
Страница 16: ...Released User Manuals and Release Notes About This User Manual 16 3BDS009029R5001 B...
Страница 29: ...Section 2 Transmission Technology RS485 network limits 3BDS009029R5001 B 29 Figure 2 RS485 network limits...
Страница 56: ...Calculation of transmission delay time TTD Section 2 Transmission Technology 56 3BDS009029R5001 B...
Страница 116: ...Updates in Revision Index B 116 3BDS009029R5001 B...
Страница 117: ......