12
Check-List for Mounting
12-7
Cabling the CAN module EI 810F (4.3.3)
Did you select either internal or external termination?
With internal termination:
Is the termination active, if the module is located at the end of the bus?
With external termination:
Were both cable ends terminated properly?
Was the internal termination disabled?
Is a 100
Ω
resistance circuitry used as the external termination?
Did you select the appropriate cable (< 80 m or 80 ... 400 m), with the sufficient
wire CSA and shielding?
Was the cable sheath stripped off properly? Was the cable connected properly
to the contact ledge?
Are the connectors fastened with screws?
Was the terminal block connected properly? Did you check the connection?
Did you mind the fact that connecting other nodes may cancel out the protective
separation?
With redundancy:
Is the connection between the terminal blocks correct?
Did you choose external termination?
Is the internal termination disabled?
Sec. 5.3 Switching on the AC 800F
Is/are the IP address(es) known? Were they set properly, depending on the
mode (standard case, special case or redundancy case)?
Is the Run/Stop switch on the power supply module set to the Run position?
Are buffer batteries provided in the Ethernet module or Battery module? Were
they installed properly?
For diagnostics:
Did you use the diagnostic cable TK 890F or TK 891F?
When using own diagnostic cables:
Did you observe the pin assignment?
Did you mind the fact that connecting a diagnostic PC/terminal may cancel out
the protective separation of the AC 800F?
Did you set the transmission parameters properly on the diagnostic PC or
terminal (transmission rate 9600 bauds, no parity, 1 stop bit)?
Is the Run/Stop switch on the power supply module in the Stop position?
Содержание AC 800F
Страница 1: ... PROCESS AUTOMATION Freelance 2019 Mounting and Installation Instructions AC 800F Controller ...
Страница 2: ......
Страница 66: ...3 Mounting the AC 800F 3 38 ...
Страница 168: ...4 Cabling the AC 800F 4 102 ...
Страница 290: ...7 Functional Description of the Fieldbus Modules 7 36 ...
Страница 317: ...10 Approvals certificates 10 1 10 Approvals certificates 10 1 ISO 9001 Fig 10 1 ISO 9001 ...
Страница 318: ...10 Approvals certificates 10 2 Fig 10 2 ISO 9001 ...
Страница 319: ...10 Approvals certificates 10 3 Fig 10 3 ISO 9001 ...
Страница 320: ...10 Approvals certificates 10 4 Fig 10 4 ISO 9001 ...
Страница 321: ...10 Approvals certificates 10 5 10 2 ISO 9000 Fig 10 5 ISO 9000 ...
Страница 322: ...10 Approvals certificates 10 6 Fig 10 6 ISO 9000 ...
Страница 323: ...10 Approvals certificates 10 7 10 3 CE Fig 10 7 CE certificate page 1 ...
Страница 324: ...10 Approvals certificates 10 8 Fig 10 8 CE certificate page 2 ...
Страница 325: ...10 Approvals certificates 10 9 Fig 10 9 CE certificate page 3 ...
Страница 326: ...10 Approvals certificates 10 10 Fig 10 10CE certificate supplement ...
Страница 327: ...10 Approvals certificates 10 11 10 4 CSA Fig 10 11 CSA certificate page 1 ...
Страница 328: ...10 Approvals certificates 10 12 Fig 10 12 CSA certificate page 2 ...
Страница 329: ...10 Approvals certificates 10 13 Fig 10 13 CSA certificate page 3 ...
Страница 330: ...10 Approvals certificates 10 14 Fig 10 14 CSA certificate page 4 ...
Страница 331: ...10 Approvals certificates 10 15 10 5 UL Fig 10 15 UL certificate ...
Страница 332: ...10 Approvals certificates 10 16 Fig 10 16 UL certificate page 2 ...
Страница 333: ...10 Approvals certificates 10 17 Fig 10 17 UL certificate page 3 ...
Страница 334: ...10 Approvals certificates 10 18 Fig 10 18 UL certificate page 4 ...
Страница 335: ...10 Approvals certificates 10 19 10 6 GUS certificate Fig 10 19 GUS certificate ...
Страница 369: ...13 Glossary 13 18 Component of the Freelance 2000 System ...
Страница 378: ......