![ABB AC 800F Скачать руководство пользователя страница 196](http://html.mh-extra.com/html/abb/ac-800f/ac-800f_mounting-and-installation-instructions-manual_2903196.webp)
5
AC 800F Functional Description
5-28
Case 2 Operating system additionally available in flash EPROM
If an operating system is additionally available in the flash EPROM, it will be started
instead of the Boot Loader. The operating system also checks slots E1 and E2 then.
In this context, ready to operate does not mean the same thing as in the context of the
Boot Loader. Here, the Ethernet module must be connected to an error-free bus
structure. Otherwise, another state can be indicated by the State LED of the module,
which is to be added to the states already described above:
State LED, Ethernet modules
•
Orange flashing
Power supply switched on, module identified. However, the
Ethernet module is not connected to a correct bus structure.
Normally, the operating system then starts the modules plugged in slots F1...F4.
Again, the State LED indicates the module state according to the list below:
State LED, fieldbus modules
•
Off
No voltage applied, module is separated
•
Orange
Power supply switched on, module identified, but not yet
configured
•
Red
Module power supply switched on:
- Not yet identified (intermediate state after normal startup
of the module or
- Module test error
Case 3 Project configuration additionally available in RAM
If a project configuration is additionally available in the RAM, the operating system will
start processing for every module plugged in slot F1 ... F4 and considered in the
configuration.
Two states indicated by the State LED are added to the ones described above:
State LED, fieldbus modules
•
Green
Power supply switched on, module identified and ready to
operate according to configuration
•
Red flashing
Power supply switched on, module identified, processing error.
Содержание AC 800F
Страница 1: ... PROCESS AUTOMATION Freelance 2019 Mounting and Installation Instructions AC 800F Controller ...
Страница 2: ......
Страница 66: ...3 Mounting the AC 800F 3 38 ...
Страница 168: ...4 Cabling the AC 800F 4 102 ...
Страница 290: ...7 Functional Description of the Fieldbus Modules 7 36 ...
Страница 317: ...10 Approvals certificates 10 1 10 Approvals certificates 10 1 ISO 9001 Fig 10 1 ISO 9001 ...
Страница 318: ...10 Approvals certificates 10 2 Fig 10 2 ISO 9001 ...
Страница 319: ...10 Approvals certificates 10 3 Fig 10 3 ISO 9001 ...
Страница 320: ...10 Approvals certificates 10 4 Fig 10 4 ISO 9001 ...
Страница 321: ...10 Approvals certificates 10 5 10 2 ISO 9000 Fig 10 5 ISO 9000 ...
Страница 322: ...10 Approvals certificates 10 6 Fig 10 6 ISO 9000 ...
Страница 323: ...10 Approvals certificates 10 7 10 3 CE Fig 10 7 CE certificate page 1 ...
Страница 324: ...10 Approvals certificates 10 8 Fig 10 8 CE certificate page 2 ...
Страница 325: ...10 Approvals certificates 10 9 Fig 10 9 CE certificate page 3 ...
Страница 326: ...10 Approvals certificates 10 10 Fig 10 10CE certificate supplement ...
Страница 327: ...10 Approvals certificates 10 11 10 4 CSA Fig 10 11 CSA certificate page 1 ...
Страница 328: ...10 Approvals certificates 10 12 Fig 10 12 CSA certificate page 2 ...
Страница 329: ...10 Approvals certificates 10 13 Fig 10 13 CSA certificate page 3 ...
Страница 330: ...10 Approvals certificates 10 14 Fig 10 14 CSA certificate page 4 ...
Страница 331: ...10 Approvals certificates 10 15 10 5 UL Fig 10 15 UL certificate ...
Страница 332: ...10 Approvals certificates 10 16 Fig 10 16 UL certificate page 2 ...
Страница 333: ...10 Approvals certificates 10 17 Fig 10 17 UL certificate page 3 ...
Страница 334: ...10 Approvals certificates 10 18 Fig 10 18 UL certificate page 4 ...
Страница 335: ...10 Approvals certificates 10 19 10 6 GUS certificate Fig 10 19 GUS certificate ...
Страница 369: ...13 Glossary 13 18 Component of the Freelance 2000 System ...
Страница 378: ......