11
3 .2 .3 .2 External battery modules
Identify the final position and keep 3U spacing
for this installation; it is recommended that this
spacing is provided below the UPS.
1. Install the ear bracket onto the unit with the
flathead M4 screw. (figure 1).
2. Slide the unit into the rail kit and make sure to
tighten the rack-mounting screw (figure 3).
3. Connect the EBM to the UPS with the battery
power cable (figure 4).
NOTE
UP TO FOUR EXTERNAL BATTERY
ENCLOSURES CAN BE CONNECTED TO
THE UPS IN THE SAME WAY AS
SHOWN ABOVE.
NOTE
AFTER CONNECTING THE BATTERY
ENCLOSURES, CONFIGURE THE NUMBER
OF BATTERY MODULES IN THE CONTROL
PANEL (FOR MORE INFORMATION SEE
CHAPTER 4.6.7). SEE APPENDIX C FOR
FURTHER DETAILS.
—
05
—
06
—
04
—
04 Battery module
connection
—
05 Display rotation
—
06 Stabilizer bracket for
external batter module
3 .2 .4
Standalone / tower installation
3 .2 .4 .1 UPS
1. Rotate the LCD module to tower direction.
(figure 5).
2. Set up the stabilizer bracket then put the unit
into the stabilizer bracket.
3 I N S TA L L AT I O N
Содержание 8408608
Страница 1: ... PowerValue 11 RT G2 6 10 kVA USER MANUAL PowerValue 11 RT G2 6 10 kVA ...
Страница 39: ...39 APPENDIX B ...