
Commissioning
– Connect a PC with EIBA Tool Software (ETS2 V1.1) to
the EIB via an RS 232 interface or connect a Powernet
®
EIB Controller to the bus line.
– Switch on the power supply to the EIB bus line or
Powernet line.
– Assign a physical address.
– Press the programming button on the UP coupler;
the red programming LED (fig.1, item 10) will become
illuminated.
– After the physical address has been programmed,
the red LED will go out.
– Write the number of the physical address on the
device using a smudge-proof pencil.
– Select and parameterize the application.
For the required temperature balancing when operating
the room temperature controller via the Powernet
®
EIB
use a balancing value of 8 °C and select “lower
measuring value” to preset the balancing direction.
– Assign the group address(es).
– Mount the room temperature controller.