![ABB 4670 Series Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/abb/4670-series/4670-series_user-manual_4287008.webp)
6
Mark fixing centres
(see Fig. 2.2)
Drill suitable
holes
Fix instrument to wall using
suitable fixings
1
2
3
Position 'U' bolts on pipe
Position plates over 'U' bolts
Secure transmitter to mounting plate
Secure plates
1
2
3
4
A – Wall-mounting
B – Pipe-mounting
68 (2.68)
214
(8.43)
232
(9.13)
Fixing Centr
es
160 (6.3)
250
(9.84)
69 (2.72)
Fixing Centres
Allowance for
Cable Bends
200 (7.9)
42
(1.65)
61 (2
3
/
8
) O.D. Vertical or Horizontal Post
Dimensions in mm (in.)
…2
MECHANICAL INSTALLATION
2.2
Mounting the Transmitter Unit
2.2.1
Wall-mounted Instrument – Figs. 2.2 and 2.3
Fig. 2.2 Overall Dimensions
Fig. 2.3 Wall/Pipe-mounting
Содержание 4670 Series
Страница 1: ...Turbidity Systems 4670 Series User Guide IM 4670_13 ...
Страница 49: ...47 NOTES ...
Страница 50: ...48 NOTES ...