79
Attachments
EN
11.1 Footprint - Terra 60
The drawing (top view) shows all the necessary measurements to:
• drill the holes to fasten the EVSE to the floor/basement (in yellow)
• prepare the position of the cables in the ground (in blue)
FRONT SIDE
603
464
506
177
62 62 62
54
151
65
85
62
23,5
38,5
111,5
160
160