Page 8
© 2023 ABB. All rights reserved.
Edge_I
-
lim_G390_QSG
Version. 2.0
Information –
Tools Required
Regulations, standards, site engineering instructions etc. take precedence over these general installation
instructions.
•
Steel toe safety shoes
•
Torque wrench
-
0
-
65 in
-
lb (0
-
10 Nm) and 40 ft
-
lbs
•
Volt Meter for Lock
-
Out Tag
-
Out procedures
•
Sockets
-
as needed for mounting hardware
•
Screwdrivers
-
#2 pozi drive screwdriver. Flat and Torx bit
set with security pin
Check for deliveries:
Make sure that the box contains the
•
8x #6
-
32 Screws (CC408578537)
•
6x 60A Fuses (4600482350P)
•
6x Fuse Covers (4600480552P)
•
9x #4
-
40 Nuts (CC408578388)
Cabinet Top
The top of the Edge cabinet is shown here. The relevant areas are noted:
1.
AC input panel which contains two twist
-
n
-
lock AC input receptacles for AC input power.
2.
Center back panel to be removed and replaced with Edge AC current limiter G390 assembly.
Two AC input
cords with
twist
-
n
-
lock
plugs
AC input panel
with two
twist
-
n
-
lock
receptacles
Center
-
Back Panel
Figure 4 Cabinet top
QUICK START GUIDE