![background image](http://html.mh-extra.com/html/abb/10ds3111/10ds3111_instruction-manual_4276019.webp)
Refer to Figure 2-3 for recommended piping arrangement and Figure 2-5 for proper gasket locations.
If a throttling valve is required, it is strongly recommended that it be placed downstream of the meter.
Upstream valves can create turbulence that result in undesirable air pockets and may affect the
meter’s accuracy or cause its output to be noisy.
FIGURE 2-5. GASKET LOCATIONS
10DS3111A INSTRUCTION MANUAL
2-6
Содержание 10DS3111
Страница 9: ...FIGURE 1 2 ELECTRONIC COMPARTMENT WITH COVERS REMOVED 10DS3111A INSTRUCTION MANUAL 1 3 ...
Страница 16: ...FIGURE 2 2 OUTLINE DIMENSIONS 14 THROUGH 24 INCHES 10DS3111A INSTRUCTION MANUAL 2 3 ...
Страница 24: ...FIGURE 2 9 10DS3111 INTERCONNECTION WIRING 14 24 in 10DS3111A INSTRUCTION MANUAL 2 11 ...
Страница 32: ...FIGURE 5 1 DIAGRAM OF FLOWMETER CIRCUIT 10DS3111A INSTRUCTION MANUAL 5 2 ...