Page 10
01/2007
AMT/PTD/PBX/0020/2/4/EN
Chapter 8: Checking the installation
This chapter describes the preliminary operations common to both the NeXspan C/S/L/D,
NeXspan 50 and NeXspan 500 ranges before the DECT installation is programmed and put in
service.
Chapter 9: Programming for the NeXspan C/S/L/D range
This chapter describes the programming steps to put in service the integrated DECT service for
NeXspan C/S/L./D
Chapter 10: Programming for the NeXspan 50/NeXspan 500 range
This chapter describes the programming steps to put in service the integrated DECT service for
NeXspan 50 and NeXspan 500 PBXs.
Chapter 11: Multi-site programming
This chapter describes the specific programming steps to put in service the integrated DECT
service for a multi-site network.
1.2
Audience
This document is for installers whose tasks are to:
•
carry out a study into positioning base stations, and system traffic flow,
•
connect base stations to the distribution frame,
•
start up and put the DECT system in service.
Содержание NeXspan C
Страница 2: ...Page 2 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 20: ...Page 20 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 66: ...Page 66 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 70: ...Page 70 01 2007 AMT PTD PBX 0020 2 4 EN Figure 4 2 Bottom view of the LD4 ST card...
Страница 134: ...Page 134 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 160: ...Page 160 01 2007 AMT PTD PBX 0020 2 4 EN...