CL STARTUP FORM
PAGE 2 of 2
REFRIGERATION SYSTEM #1
PRESSURE
SATURATED
LINE
SUB-COOLING
SUPERHEAT
TEMPERATURE
TEMPERATURE
DISCHARGE
SUCTION
LIQUID
REFRIGERATION SYSTEM #2
PRESSURE
SATURATED
LINE
SUB-COOLING
SUPERHEAT
TEMPERATURE
TEMPERATURE
DISCHARGE
SUCTION
LIQUID
REFRIGERATION SYSTEM #3
PRESSURE
SATURATED
LINE
SUB-COOLING
SUPERHEAT
TEMPERATURE
TEMPERATURE
DISCHARGE
SUCTION
LIQUID
REFRIGERATION SYSTEM #4
PRESSURE
SATURATED
LINE
SUB-COOLING
SUPERHEAT
TEMPERATURE
TEMPERATURE
DISCHARGE
SUCTION
LIQUID
CONDENSER FAN AMPS
ALIGNMENT________
CHECK ROTATION__________
NAMEPLATE AMPS________
NUMBER
HP
L1 Volts/Amps
L2 Volts/Amps
L3 Volts/Amps
1
2
3
4
5
6
CONDENSER PUMP AMPS
CHECK ROTATION______________
NUMBER
HP
L1 Volts/Amps
L2 Volts/Amps
L3 Volts/Amps
1
2
Содержание CL SERIES
Страница 1: ...CL SERIES Condensing Units Installation Operation Maintenance ...
Страница 25: ...25 Figure 6 Evaporative Condenser Section Water Treatment Components ...
Страница 56: ...NOTES ...
Страница 57: ...AAON E Coated Coil Maintenance Record ...
Страница 59: ......