CL STARTUP FORM
PAGE 1 of 2
DATE:___________________
JOB NAME:_________________________________________________________________________________________
ADDRESS:_________________________________________________________________ MODEL No:______________
CITY, STATE:______________________________________________________________ SERIAL No:______________
START-UP CONTRACTOR:___________________________________________________ TAG:____________________
PRE START-UP CHECKLIST
Installing contractor shall verify the following items (cross out items that do not apply).
1. Is there any visible shipping damage?__________________________________________________ Yes
No
2. Is the unit installation level?__________________________________________________________
Yes
No
3. Are the unit clearances adequate for service and operation?_________________________________ Yes
No
4. Do all access doors open freely and are the handles operational?_____________________________ Yes
No
5. Have all shipping braces been removed?________________________________________________ Yes
No
6. Have all electrical connections been tested for tightness?___________________________________ Yes
No
7. Does the electrical service correspond to the unit nameplate?________________________________ Yes
No
8. Has the overcurrent protection been installed to match unit nameplate requirement?______________ Yes
No
9. Have all set screws on fans been tightened?______________________________________________ Yes
No
10. Do all fans and pumps rotate freely?___________________________________________________ Yes
No
UNIT CONFIGURATION
AIR COOLED__________
EVAPORATIVE COOLED _____
NO WATER LEAKS ___
CONDENSER SAFETY CHECK_______
COOLING TEST
COMPRESSORS
CRANKCASE
NUMBER
MODEL #
AMPS
HEATER
L1 Volts/Amps
L2 Volts/Amps
L3 Volts/Amps
AMPS
1
2
3
4
5
6
7
8
AMBIENT TEMPERATURE
AMBIENT DRY BULB TEMP_______________°F
AMBIENT WET BULB TEMP_______________°F
Содержание CL SERIES
Страница 1: ...CL SERIES Condensing Units Installation Operation Maintenance ...
Страница 25: ...25 Figure 6 Evaporative Condenser Section Water Treatment Components ...
Страница 56: ...NOTES ...
Страница 57: ...AAON E Coated Coil Maintenance Record ...
Страница 59: ......