![A&D FG-D-CWP Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/aandd/fg-d-cwp/fg-d-cwp_instruction-manual_3044825008.webp)
8
Load cell
Cable
Cable
(A) 6-wire configuration connection
(B) 4-wire configuration
to load cell (recommended)
connection to load cell
Precautions for connecting with the 4-wire configuration
Make sure to do the following when connecting with the 4-wire configuration.
Short-circuit between EXC+ and SEN+, and between EXC- and SEN-.
When using a long a load cell cable, use one with a cross-sectional area that is
as large as possible. Also, use a cable that is as short as possible.
Ref.: Connection examples of connecting to the SCB series, Dust & Waterproof Precision
Weighing Platform (with the 4-wire configuration)
Load cell
terminal number
Color of cable core
for the SCB series
Function of terminals for
SCB series
1
White
Excitation - (Input terminal)
2
Red
Exci (Input terminal)
3, 4
Blue
Signal - (Output terminal)
5, 6
Green
(Output terminal)
7
Yellow
Shield
Method
Advantage
Disadvantage
Remark
6-wire
configuration
(recommended)
Less error even if
the length of load cell
cable is long or a thin
load cell cable is used.
Less error even if multiple
load cells are used.
Slightly complicated to wire.
When using a summing box,
it is strongly recommended
wiring be done with the
6-wire configuration.
4-wire
configuration
Easy to wire.
The accuracy of temperature
counting is affected by
resistance of the conductor
wire for the load cell cable.
It is affected by contact
resistance of the connector.
Using a long load cell
cable or multiple load cells
tends to cause error.
Shield
Load cell input (+)
Load cell excitation voltage (-)
Sensing input (-)
Sensing input (+)
Load cell excitation voltage (+)
Shield
Load cell input (-)