Working clearances
For access to the appliance, it is recommended that the following clearances
are observed (see figure):
•
AA: around the appliance's control column and cleaning openings: 100 cm.
•
BB: all sides of the appliance: 50 cm.
•
Above the appliance (room to replace the anodes):
-
100 cm if using fixed anodes, or
-
50 cm if using flexible anodes.
If the available clearance is less than 100 cm, flexible magnesium anodes
may be ordered.
Note
When installing the appliance, be aware that any leakage from the tank
and/or connections can cause damage to the immediate environment or floors
below the level of the boiler room. If this is the case, the appliance should be
installed above a wastewater drain or in a suitable metal leak tray.
The leak tray must have an appropriate wastewater drain and must be at least
5cm deep with a length and width at least 5cm greater than the diameter of the
appliance.
Working clearances
Содержание SGE
Страница 1: ...40 60 Installation User and Service Manual Installation User and Service Manual...
Страница 2: ...www aosmithinternational com your installer...
Страница 4: ...4 Instruction manual SGE gis...
Страница 8: ...Table of contents 8 Instruction manual SGE...
Страница 12: ...Introduction 12 Instruction manual SGE 1 gis...
Страница 30: ...Installation 30 Instruction manual SGE 3 is Types of appliances...
Страница 48: ...Conversion to a different gas category 48 Instruction manual SGE 4 is...
Страница 49: ...Instruction manual SGE 49 gis 5 Filling Installation diagram...
Страница 53: ...Instruction manual SGE 53 gis 6 Draining Installation diagram...
Страница 64: ...Shutting down 64 Instruction manual SGE 10 gis...
Страница 92: ...Maintenance frequency 92 Instruction manual SGE 14 is...
Страница 101: ...Instruction manual SGE 101 is...
Страница 106: ...Appendices 106 Instruction manual SGE 17 is...
Страница 108: ...Instruction manual SGE 108...