35
water piping diagrams
N
OTES
:
1.
P
re
ferred
piping
diagram
.
2.
The
tempera
ture
and
pre
ss
ure
relie
f valve
se
tting
shall
no
t exceed
pressure
ra
ting
o
f any
componen
t in
the
sys
tem
.
3.
S
ervi
ce
v
al
ves
are
s
hown
for
ser
vicing
uni
t.
Howeve
r,
local
codes
shall
govern
their
usage
.
4.
The
T
ank
T
empera
ture
Con
trol
should
be
wired
to
and
con
trol
the
pump
be
tween
the
wa
ter
hea
ter(s)
and
the
s
torage
tank(s)
.
5.
The
wa
ter
hea
te
r’s
opera
ting
thermos
ta
t should
be
se
t 5
degrees
F
higher
than
the
T
ank
T
empera
ture
Con
trol
.
MU
LTI F
LUE
- (1 UNIT) WITH VE
R
TICA
L S
TORAGE
T
ANK
LEGEND
TEMPER
AT
URE & PRESSURE
RELIEF
VA
LV
E
PRESSURE RELIEF
VA
LV
E
CIRCULA
TING PUMP
TA
NK
T
EM
PE
R
AT
URE C
O
N
TR
O
L
DRAIN
FULL
PO
R
T
BAL
L
VA
LV
E
TEMPER
AT
URE GAGE
W
ATER FLOW SWITC
H
CHECK
VA
LV
E
W
ARNING:
THIS DR
AW
ING SHOWS SUGGESTED
PIPING CONFIGUR
AT
ION
AND OTHER DEVICES;
CHECK WITH LOCAL
CODES
AND ORDINANCES
FOR
ADDITIONA
L
REQUIREMENTS
.
FINISHED FLOOR
HO
T
W
ATE
R
TO
FIXTURE
S
COLD WATE
R
SUPPLY
EXPANSION TANK
ALT. COLD WATE
R
CONNECTION
HO
T
W
ATE
R
RETURN
FROM
FIXTURE
S
PIPE T&P TO OPEN DRAIN
Содержание Master-Fit BTN-200
Страница 51: ...Warranty 51 ...