
Installation
26
Instruction manual GWV
3
is
3.6
Water connections,
Vented
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations
(1.3 "Regulations")
.
3.6.1
Cold water side
See (A) in the installation diagram
(3.5 "Installation diagram")
.
1. Fit an approved stop valve (4) on the cold water side between the cold water
head tank (18) and the appliance, as required by
regulations
(1.3 "Regulations")
.
3.6.2
Hot water side
See (B) in the installation diagram
(3.5 "Installation diagram")
.
Note
Insulating long hot water pipes prevents unnecessary energy loss.
1. Fit the T&P valve (3).
2. Optional: fit a temperature gauge (12) so you can check the temperature of
the tap water.
3. Fit a stop valve (11) in the hot water outlet pipe for servicing.
4. If a circulation pipe is required, continue by installing the circulation
pipe
(3.6.3 "Circulation pipe")
.
3.6.3
Circulation pipe
See (C) in the installation diagram
(3.5 "Installation diagram")
.
If an immediate flow of hot water is required at draw-off points, a circulation
pump can be installed. This improves comfort and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance
of the circulation system.
2. Fit a non-return valve (5) behind the circulation pump to guarantee the
direction of circulation.
3. Fit two stop valves for service purposes (4).
4. Connect the circulation pipe up to a connection of the storage tank.
3.6.4
System pump
The pump revs can be set using an adjuster unit. This setting depends on the
length of the pipes X between the storage tank and the appliance.
Legend
Only applicable numbers are mentioned.
1.
pressure-reducing valve (mandatory if the mains
water pressure exceeds 8 bar)
2.
inlet combination (mandatory)
3.
expansion valve
4.
stop valve (recommended)
5.
non-return valve (mandatory)
6.
circulation pump (optional)
9.
drain valve
10.
manual gas valve (mandatory)
11.
service stop valve
12.
temperature gauge (recommended)
14.
hot water draw-off points
15.
expansion valve (mandatory)
16.
expansion vessel (mandatory)
18.
water tank
19.
float valve
23.
P-valve
A.
cold water supply
B.
hot water supply
C.
circulation pipe
D.
gas supply
E.
overflow pipe
H.
overflow safety
Содержание GWV - 120
Страница 2: ...www aosmithinternational com your installer ...
Страница 4: ...4 Instruction manual GWV gis ...
Страница 8: ...Table of contents 8 Instruction manual GWV ...
Страница 12: ...Introduction 12 Instruction manual GWV 1 gis ...
Страница 40: ...Installation 40 Instruction manual GWV 3 is ...
Страница 42: ...Conversion to a different gas category 42 Instruction manual GWV 4 is ...
Страница 46: ...Filling 46 Instruction manual GWV 5 gis ...
Страница 58: ...Starting and running 58 Instruction manual GWV 9 gis ...
Страница 60: ...Shutting down 60 Instruction manual GWV 10 gis ...
Страница 72: ...Service program 72 Instruction manual GWV 12 is ...
Страница 86: ...Troubleshooting 86 Instruction manual GWV 13 gis ...
Страница 88: ...Maintenance frequency 88 Instruction manual GWV 14 is ...
Страница 98: ...Appendices 98 Instruction manual GWV 17 is ...
Страница 100: ...Instruction manual GWV 100 ...
Страница 102: ...0307 971 4 0 UK Index Instruction manual GWV ...