1.2.1  Boil Dry Protection

Fig. 2 - 

fl

 oat switch

The boil dry protection mechanism 
consists of a 

fl

 oat switch which monitors 

the water level approximately halfway 
up the tank above the elements. If there 
is insuf

fi

 cient water present in the tank, 

then the 

fl

 oat (1) hangs down. If the tank 

is 

fi

 lled with water then the 

fl

 oat is moved 

upwards by the water. In the electrical 
diagram the 

fl

 oat switch is reproduced 

diagrammatically. The actual process 
is as follows: the 

fl

 oat arm moves a 

magnet with respect to the reed-contact 
(2) which is located in the black plastic 
tube at the end of the 

fl

 oat switch. The 

movement of the magnet changes the 
magnetic 

fi

 eld and the reed-contact is 

closed. 

The exposure height (3) of the reed 
contact is very important.

This is 14 mm. This setting may not 
be changed!

Explanation:

With an exposure height of 14 mm the 
switch point is approximately halfway 
along the stroke of the 

fl

 oat. 

If the exposure height is set lower, then 
the switch point shifts upwards. If the 
exposure height is too small the contact 
will no longer connect even if the 

fl

 oat 

is completely above it. In this case the 
device will not come into operation.
If the exposure height is set lower than 
14 mm , then the switch point shifts 
downwards. This means that the contact 
will already connect upon a small 
upwards movement of the 

fl

 oat. If the 

exposure height is set too high then the 
contact is permanently closed and the 
safety mechanism does not work. This 
means that the elements can come into 
operation without there being suf

fi

 cient 

water present in the device. This will lead 
to the elements burning out in a very 
short time and short circuit and leakage. 
So never change the exposure height. 

The reed contact and the 

fl

 oat must 

always be vertical. The arrow on the 
clamping plate on the front must point 
upwards. The 

fl

 oat switch is secured in 

the tank with nut (5). By loosening nut 
(4) the 

fl

 oat switch can be set vertically. 

Nut (4)
is sealed with an o-ring with respect to 
nut (5). The 

fl

 oat switch must be taken 

out of the device as a complete unit 
for checking or replacement. (The 

fl

 oat 

cannot be passed through the opening in 
nut (5).) For this purpose the device thus 
has to be drained.

Содержание DURA-Power DRE-52

Страница 1: ...HOT WATER STORAGE DEVICES england MODELS DRE 52 DRE 80 DRE 120 INSTALLATION AND USER INSTRUCTIOINS...

Страница 2: ...this manual and in conformity with the General Terms and Conditions as filed with the Chamber of Commerce For further information see the General Terms and Conditions These can be obtained from us fr...

Страница 3: ...t of Operation 17 2 2 4 Temperature Regulation 18 2 3 Maintenance 18 2 3 1 Sacrificial anode 18 2 3 2 Descaling 18 2 4 Steps When There is a Fault 18 2 4 1 Water Temperature Not Good 19 2 4 2 Presumed...

Страница 4: ...el plate which has a glass lined coating on the inside The tank is also provided with two sacrificial anodes to give extra protection against corrosion A thick CFC free polyurethane insulation layer c...

Страница 5: ...5 Fig 1 regulation and safety 1 2 Regulation and Safety For clarification see the diagram below the image is an extract from the electrical diagram further on...

Страница 6: ...to the regulating thermostat 9 The element 10 is fed from the regulating thermostat During normal operation the regulating thermostat 9 switches the element 10 on and off If a temperature of above 93...

Страница 7: ...e exposure height is too small the contact will no longer connect even if the float is completely above it In this case the device will not come into operation If the exposure height is set lower than...

Страница 8: ...and 1 5 Ohms Screw the float switch back into the tank and place it vertically Check the exposure height Close the door and connect the feed voltage The safety relays must not come in The tautening a...

Страница 9: ...meter of boiler 560 640 750 E Depth 690 790 910 M Height of drain valve 125 125 125 R Height cold water supply 125 125 125 S Height T P connection 1230 1335 1380 1 Cold water connection 1 14NPT 1 14NP...

Страница 10: ...uous 40 C litres hour 241 258 482 516 963 1032 Weight kg 73 73 73 Type DRE 80 9 DRE 80 18 DRE 80 36 DRE 80 54 Tank capacity litres 300 300 300 300 Number of elements 3 3 6 9 Power 380V 3F kW 7 6 15 2...

Страница 11: ...ing time up to 40 400 414V min 112 105 56 52 28 26 19 17 Tap capacity 1st hour 60 C 400 414V litres 569 579 707 726 981 1020 1256 1314 Tap capacity continuous 60 C 400 414V litres hour 145 155 289 310...

Страница 12: ...itted in such a way that it constantly slopes upwards A stop valve or non return valve must never be fitted between the inlet combination and the device During heating of the device expansion water as...

Страница 13: ...elow Diagram A Diagram B Diagram C Electrical diagram for 3 phase Electrical diagram for 3 phase Electrical diagram for 3 phase connection connection with 3 elements connection with 6 elements with ni...

Страница 14: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 15: ...nsformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2 Red Rood Rot Rouge 3 Blue Blauw Blau Ble...

Страница 16: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 17: ...et the desired temperature on the regulating thermostat see table When leaving the factory the temperature is set at 60 C Temperature in F Temperature in C 120 49 130 54 140 60 150 66 160 71 170 77 18...

Страница 18: ...d cleaned by a recognised installation engineer at least once per year so that good operation can be guaranteed During maintenance the device must never be under voltage 2 3 1 Sacrificial anode The li...

Страница 19: ...ximum thermostats which break the circuit when the water temperature is too high 93 C These maximum thermostats can only be reset again once the temperature has dropped 20 C Then the regulating thermo...

Страница 20: ...se Solution Insufficient or no hot water Temperature set too low Set regulating thermostats higher Maximum thermostats break the circuit Press in reset button Connector is not seated in stop contact m...

Страница 21: ...1 Check whether the device is filled with water 2 Switch the mains switch on for a fixed connection or place the connector in the stop contact 3 1 3 Use The device is under water pipe pressure maximu...

Страница 22: ...t hot water drainage point for ventilating the tank Take care that the feed pipe and inlet combination cannot freeze Drain the feed pipe as necessary and check whether all other pipes are empty 3 2 Ma...

Страница 23: ...ccording to the installation instructions of A O Smith for the specific model as well as according to the local and national installation and building regulations instructions and rules b that the boi...

Страница 24: ...or any parts thereof ex the Veldhoven warehouse Any costs involved with transport labour installation or any other capacity connected to the replacement cannot be charged to A O Smith 4 6 Claims A cl...

Страница 25: ...25...

Страница 26: ...26 0310 145_R1...

Отзывы: