A.O. Smith Burkay HW-300 Скачать руководство пользователя страница 13

13

13

13

13

13

After it has been determined that each appliance remaining
connected to the common venting system properly vents when
tested as outlined above, return doors, windows, exhaust fans,
fireplace dampers and any other gas burning appliance to their
previous conditions of use.

Any improper operation of the common venting system should be
corrected so the installation conforms with the latest edition of
CAN/CGA B149.1-00 (latest edition).  When resizing any portion of
the common venting system, the common venting system should
be resized to approach the minimum size as determined using
the appropriate tables in Appendix G in CAN/CSA B149.1-00.

4. MULTIPLE VENT TABLE

Table 9 has been compiled to show the material sizes in a Type B
doublewall combined vent system.  Refer to
CAN/CSA B149 .1-00 (latest edition), or the ASHRAE 1983
Equipment Volume for further information.

A combined vent system is one in which two or more boilers at one
level are attached to a common vent.

In order to use table 9, the connector rise and total vent height
must be known.  Connector rise is vertical distance from the draft
hood outlet to the point where the manifold connection is made.
Total vent height is the least vertical distance from a draft hood
outlet to the top of the vent.  Local codes or utility requirements
often govern termination height.  ULC listed doublewall gas vents,
up through 24" (610mm) diameter, can be installed in heated and
unheated areas and can pass through floors, ceilings, partitions,
walls and roofs, provided the required one inch clearance is
observed.  These vents should be installed in accordance with
CAN/CSA B149.1-00 (latest edition).

EXAMPLE SHOWING USE OF THE HWB/HW-610 COMBINED VENT
SIZING TABLE 9

  

FIGURE 8

Where a continuous or intermittent back draft is found to exist the
cause must be determined and corrected.  A special vent cap may
be required.  If the back draft cannot be corrected by the normal
methods or if a suitable draft cannot be obtained, a blower type
flue gas exhauster may be employed to ensure proper venting and
correct combustion if permitted by local codes.

 

WARNING

FAILURE TO CORRECT BACK DRAFTS WILL CAUSE AIR
CONTAMINATION AND UNSAFE CONDITIONS.

Vent connectors serving appliances vented by natural draft shall
not be connected into any portion of mechanical draft systems
operating under positive pressure.

3. CONNECTING BOILER TO A COMMON VENT

Do not connect the boiler to a common vent or chimney with solid
fuel burning equipment.  This practice is prohibited by many local
building codes as is the practice of venting gas fired equipment to
the duct work of ventilation systems.

Where a separate vent connection is not available and the vent
pipe from the boiler must be connected to a common vent with oil
burning equipment, the vent pipe should enter the common vent
or chimney at a point ABOVE the flue pipe from the oil fired unit.

Where two or more appliances vent into a common vent connector
or manifold, the area of the common vent or vent connector should
at least equal the area of the largest vent connector plus 50% of
the areas of the additional draft hood outlets.

When removing a boiler from a system with a common vent, use
the following steps:

Be sure the other appliances connected to the common vent are
not in operation.

Seal any unused openings in the common venting system.

Visually inspect the venting system for proper size and horizontal
pitch and determine there is no blockage or restriction, leakage,
corrosion and other deficiencies which could cause an unsafe
condition.

 

WARNING

Ensure sufficient supply and ventilation air. Under no circumstances
should the equipment room where the boiler is installed ever be
under negative pressure. Insufficient air supply can interfere with
combustion and ventilation of this boiler resulting in unsafe
conditions.

Insofar as is practical, close all building doors and windows and
all doors between the space in which the appliances remaining
connected to the common venting system are located and other
spaces of the building.  Turn on clothes dryers and any appliance
not connected to the common venting system.  Turn on any exhaust
fans, such as range hoods and bathroom exhausts, so they will
operate at maximum speed.  Close fireplace dampers.

Place in operation the appliance being inspected.  Follow the
lighting instructions.  Adjust thermostat so appliance will operate
continuously.

Test for spillage at the draft hood relief opening after five minutes
of main burner operation.  Use the flame of a match or candle.

Содержание Burkay HW-300

Страница 1: ...ONTAINS INFORMATION RELATIVE TO YOUR SAFETY PLEASE READ THOROUGHLY BEFORE USING APPLIANCE WARNING If the information in this manual is not followed exactly a fire or explosion may result causing prope...

Страница 2: ...1451 68 5 16 1735 67 1702 64 3 4 1645 B Height to top of jacket 43 1 4 1099 45 1 8 1146 45 1 8 1146 56 1 4 1429 56 1 4 1429 56 1 4 1429 C Floor to center line water inlet 36 914 38 3 4 984 38 3 4 984...

Страница 3: ...831 1 627 1 464 1 331 1 220 1 127 1 046 GPH 1 935 1 290 967 774 645 553 484 430 387 352 322 298 276 HW 420 420 000 LPH 7 708 5 138 3 854 3 083 2 569 2 202 1 927 1 713 1 542 1 401 1 285 1 186 1 101 GPH...

Страница 4: ...MMON VENTINGSYSTEM 54 GENERALMAINTENANCE 55 Relief Valve 55 CLEANINGANDFLUSHINGINSTRUCTIONS 55 Internal Contaminants 55 Hot Water Supply Boilers Preventive Maintenance 55 Deliming 55 56 Deliming Solve...

Страница 5: ...OF AIR WILL CAUSE RECIRCULATION OF COMBUSTION PRODUCTS RESULTING IN AIR CONTAMINATION THAT MAY BE HAZARDOUS TO LIFE SUCH A CONDITION OFTEN WILL RESULT IN A YELLOW LUMINOUS BURNER FLAME CAUSING CARBONI...

Страница 6: ...y uncontaminated air should be obtained from remote or outside sources INSTALLATION CLEARANCES These boilers are approved for installation on combustible flooring in an alcove with minimum clearance t...

Страница 7: ...w Installations A O Smith LINEAR TEMP systems have been designed to provide efficient trouble free operation of the boiler sizes covered in this manual with any of the following conditions a Unknown s...

Страница 8: ...stallation is an excellent way to modernize the system The A O Smith boiler s should be installed on a pipe loop with a separate circulating pump selected from PUMPAND PIPE SIZING DATATABLE Figure 3 s...

Страница 9: ...PIPINGISOLATION OFTHEBOILERFROMTHECHILLER FIGURE4 If the boiler is connected to chilled water piping or its heating coils are exposed to refrigerated air the boiler piping system must be equipped with...

Страница 10: ...ched to the piping system When table 6 is to be used to select the piping size calculate the gas demand in terms of cubic feet per hour for each piping system outlet The gas demand for an appliance ca...

Страница 11: ...ith a cubic foot per hour demand of 2 060 and with 50 lineal feet of gas supply line table 6 shows a pipe size of 3 76mm is required NOTE For other than 60 specific gravity apply multiplier factor as...

Страница 12: ...or chimney must be a minimum height of 12 305mm above the annual snow fall to prevent blockage Building materials must not come in contact with combustion products from stack or chimney due to the de...

Страница 13: ...NAND UNSAFE CONDITIONS Vent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under positive pressure 3 CONNECTING BOI...

Страница 14: ...12 12 12 12 12 12 12 2 12 12 12 10 10 10 10 10 10 3 12 10 10 10 10 10 10 10 10 4 or more 10 10 10 10 10 10 10 10 10 Number Total Total Vent Height Measured in Feet Above Draft Hood if Units Input 10...

Страница 15: ...he combustion products are going up the chimney or gas vent properly by passing a lighted match or taper around the edge of the relief opening of the draft hood If the chimney or gas vent is drawing p...

Страница 16: ...L REGULATIONS The boiler when installed must be electrically bonded to ground in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the N...

Страница 17: ...ECTIONDIAGRAM HWB HW 300 399 420 500 610 NATURALGAS SINGLESTAGEI I D ROBERTSHAW GASVALVE HWB HW 300 399 420 520 610 NATURAL GAS ONLY CANADIAN MODELS FIGURE10 Robertshaw is a registered trademark of Fu...

Страница 18: ...18 18 18 18 18 CONNECTIONDIAGRAM HWB HW 420 520 610 PROPANEGAS SINGLESTAGEPROPANE ROBERTSHAWGASVALVE 24 VOLT HW HWB 420 520 610 CANADIAN MODELS FIGURE11...

Страница 19: ...19 19 19 19 19 SINGLESTAGEPROPANEROBERTSHAWGASVALVE 24 VOLT HWB HW 300 399 CANADIAN MODELS FIGURE11A CONNECTION DIAGRAM HWB HW 300 399 PROPANEGAS FIGURE13...

Страница 20: ...20 20 20 20 20 HW 300 HW 399 HW 420 HW 500 HW 670 NATURALGAS SINGLESTAGEI I D ROBERTSHAWGASVALVE HW 300 399 420 520 670 NATURAL GAS ONLY U S MODELS FIGURE11B...

Страница 21: ...21 21 21 21 21 HW 300 HW 399 HW 420 HW 500 HW 670 PROPANEGAS FIGURE12 SINGLESTAGEI I D ROBERTSHAWGASVALVE HW 300 399 420 520 670 PROPANE GAS ONLY U S MODELS FIGURE11C...

Страница 22: ...emperature thermostats A single bulb outdoor sensing control will prevent overheating of halls stairways or other uncontrolled areas There are occasions when outdoor temperatures are temporarily too w...

Страница 23: ...IAGRAM TWO BOILER LINEAR TEMP INSTALLATION WITH TWO CIRCULATORS FIGURE13 CONTROLAPPLICATIONDIAGRAM THREEBOILERLINEAR TEMP INSTALLATIONWITHTHREECIRCULATORS FIGURE14 NOTE 1 Building temperature controls...

Страница 24: ...ATION WITH TWO CIRCULATORS FIGURE15 NOTE 1 Building temperature controls supply electric power to building circulator 2 Main flow switch proves main water flow before energizing sequencing and resetti...

Страница 25: ...UNIT INSTALLATION FOR HOT WATER SUPPLY APPLICATION CANADIAN MODELS JUNCTION BOX W 6 TERMINALS FIGURE 17 FIGURE 19 CER TEMP 80 1 UNIT INSTALLATION FOR HOT WATER SUPPLY APPLICATION U S MODELS JUCNTION...

Страница 26: ...26 26 26 26 26 CER TEMP 80 2 OR 3 UNIT INSTALLATION FOR HOT WATER SUPPLY APPLICATION CANADIAN MODELS JUNCTION BOX W 6 TERMINALS FIGURE 20...

Страница 27: ...27 27 27 27 27 FIGURE 21 SCHEMATIC CANADIAN MODELS JUNCTION BOX W 6 TERMINALS...

Страница 28: ...28 28 28 28 28 CER TEMP 80 2 OR 3 UNIT INSTALLATION CONNECTION DIAGRAM FOR HOT WATER SUPPLY APPLICATION U S MODELS JUNCTION BOX W 4 TERMINALS FIGURE 22...

Страница 29: ...29 29 29 29 29 CER TEMP 80 2 OR 3 UNIT INSTALLATION SCHEMATIC DIAGRAM FOR HOT WATER SUPPLY APPLICATION U S MODELS JUNCTION BOX W 4 TERMINALS FIGURE 23...

Страница 30: ...30 30 FIGURE 24 BOOSTER RECOVERY WIRING DIAGRAM CANADIAN MODELS JUNCTION BOX W 6 TERMINALS SHURE TEMP BOOSTER RECOVERY WIRING DIAGRAM TWO TEMPERATURE SYSTEM CANADIAN MODELS JUNCTION BOX W 6 TERMINALS...

Страница 31: ...1 31 31 31 BOOSTER RECOVERY WIRING DIAGRAM U S MODELS JUNCTION BOX W 4 TERMINALS FIGURE 26 SHURE TEMP BOOSTER RECOVERY WIRING DIAGRAM TWO TEMPERATURE SYSTEM U S MODELS JUNCTION BOX W 4 TERMINALS FIGUR...

Страница 32: ...nt is recommended This will protect the dishwashers coffee urns water boilers water piping and other equipment When water softening or water treatment is not practical a comparatively easy method of p...

Страница 33: ...as shown in the installation diagrams Thermometers are installed in the system as a means of detecting a possible liming condition in the boiler An increase of 3 C 5 F over the normal temperature rise...

Страница 34: ...ON HW 520 HW 610 HW 670 WIRING FIGURES 17 18 19 INSTALLINACCORDANCE WITH ALL LOCAL CODES ONE HW 300 HW 399 HW 420 HW 520 HW 610 OR ONE HW 670 UP FLOW MODEL COMMERCIALBOILERWITHVERTICALTANK USETHISTAB...

Страница 35: ...EIR USAGE PRESSURE RELIEF VALVE RATING SHOULD NOT EXCEED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM INSTALL THERMOMETER AND PRESSURE RELIEF IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 USETHISTA...

Страница 36: ...F ANY COMPONENT IN THE SYSTEM INSTALL THERMOMETER AND PRESSURE RELIEF IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 WIRING FIGURES 20 21 22 OR 23 HEATERS SPACED 30 APART INSTALLINACCORDANCE WITH ALL LO...

Страница 37: ...ED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM INSTALL THERMOMETER AND PRESSURE RELIEF IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 WIRING FIGURES 20 21 22 or 23 INSTALLINACCORDANCE WITH ALL LOCA...

Страница 38: ...SHOULD NOT EXCEED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM INSTALLTHERMOMETER AND PRESSURE RELIEF IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 FIGURE 33 USETHISTABLEFORCORRECT PUMPAND WATER PI...

Страница 39: ...EXCEED PRESSURE CAPACITY OF ANY COMPONENT IN THE SYSTEM INSTALLTHERMOMETERAND PRESSURE RELIEF IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 WIRING FIGURES 20 21 22 OR 23 HEATERS SPACED 24 APART INSTAL...

Страница 40: ...F IN OPENINGS PROVIDED ON HW 520 HW 610 HW 670 IMPORTANT THE INSTALLATION OF SAFETY FLOW SWITCH AS SHOWN IS REQUIRED TO PROTECT THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR CIRCULATOR FAILURE A...

Страница 41: ...E BOOSTER OUTPUT ADD ANANTI SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES USETHISTABLEFORCORRECT PUMPAND WATER PIPE SIZE Minimum B G Armstrong Model Pipe Size Pump Pump Number Inches Size Size HW 300...

Страница 42: ...STALLATION OF SAFETY FLOW SWITCH AS SHOWN IS REQUIRED TO PROTECT THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR CIRCULATOR FAILURE A O SMITH PKG NO 211480 WIRING FIGURE 24 OR 26 INSTALLINACCORDAN...

Страница 43: ...160 F with 20 F differential minimum Right Dial Tank Temperature Adjust to 140 F with 8 F differential minimum May be adjusted slightly higher if total demand of 180 F water requires higher tank tempe...

Страница 44: ...TANKS DANGER TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES SEE TANK TEMPERATURE CONTROL WARNING ON PAGE 32 IF HIGHER PREHEATTEMPERATURESARENECESSARYTO OBTAIN ADEQUATE BOOSTER...

Страница 45: ...ng causing a call for heat and allowing unit to run until High Limit Temperature Control trips 3 Resetting the High Limit Temperature Control to a higher setting unit should run 4 Reset System Control...

Страница 46: ...ics are not evident check for accumulation of lint or other foreign material that restricts or blocks the air openings to the burner or boiler Also check for good flow of combustion and ventilating ai...

Страница 47: ...OUR GAS SUPPLIER FROM A NEIGHBOR S PHONE FOLLOW THE GAS SUPPLIER S INSTRUCTIONS IF YOU CANNOT REACH YOUR GAS SUPPLIER CALL THEFIREDEPARTMENT C USE ONLY YOUR HAND TO PUSH IN OR TURN THE GAS CONTROL KNO...

Страница 48: ...UCH ANY ELECTRIC SWITCH DO NOT USE ANY PHONE IN YOUR BUILDING IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBOR S PHONE FOLLOW THE GAS SUPPLIER S INSTRUCTIONS IF YOU CANNOT REACH YOUR GAS SUPPLIER CA...

Страница 49: ...ot gas adjustment located in the gas valve The pilot flame should envelop 3 8 to 1 2 inch of the tip of the thermocouple Remove pilot adjustment cover screw fig 43b Turn inner adjustment screw or pilo...

Страница 50: ...eads from a test flashlight The model N22T test kit combination flashlight and continuity tester is manufactured by the RAY O Vac Company Madison WI and available through local suppliers With the flas...

Страница 51: ...S SECONDS Type Value HWB HWB HWB HWB HWB HWB Gas Btu Ft 3 HW 300 HW 399 HW 420 HW 520 HW 610 HW 670 Natural 1050 12 6 9 5 9 0 7 3 6 2 5 7 Propane 2500 30 0 22 6 21 4 17 3 14 8 13 4 IMPORTANT UNDER NO...

Страница 52: ...e check the rating plate before making changes The input reduction is primarily achieved by reducing the size of the main burner orifices To do this the main burner orifices require replacement with o...

Страница 53: ...2 x 1 1 2 x 1 tee for a 1 1 2 pipe application For larger pipe sizes use a reducing tee in order to keep the switch as close to the pipe as possible Install the flow switch in the branch top opening...

Страница 54: ...rdered through A O Smith dealers authorized servicers or distributors Refer to the Yellow Pages for where to call or contact the A O Smith Enterprises Ltd P O Box 310 768 Erie St Stratford Ontario N5A...

Страница 55: ...at may have accumulated during installation This is doubly important when a replacement boiler is installed into an existing system where Stop Leak or other boiler additives have been used Failure to...

Страница 56: ...inue to fill until foaming action stops 9 When foaming action has stopped completely allow 10 to 15 minutes for the solvent to dissolve any remaining scale in the unit 10 Open the drain cock and drain...

Страница 57: ...wiring Repair or defective replace valve Circulating pump Power off or system Check power supply and burner off wiring is incorrect and wiring Tank temperature control Replace thermostat defective Bur...

Страница 58: ...s the ceramic insulator surrounding the electrode cracked or broken Replace pilot burner assembly Replace ignition module Turn on gas supply turn on power supply Securely connect cable and or ground w...

Страница 59: ...e firmly attached to pilot assembly and GND terminal on module Are ignition cable and ground wire in good condition not brittle burnt or cracked Ensure ground strap is the closest metal to the igniter...

Страница 60: ...he igniter sensor rod in good condition not broken or cracked Is the igniter sensor rod in good condition not worn corroded sooted or damaged Replace ignition module Correct the situation by consultin...

Страница 61: ...pilot ground wire firmly attached to the pilot assembly and GND terminal on module Are high voltage cable and ground wire in good condition not brittle burnt or cracked Make sure pilot flame spreader...

Страница 62: ...dministrative charges for forwarding the replacement part from the nearest distributor and returning the claimed defective part to such distributor c All cost necessary or incidental for any materials...

Страница 63: ...63 63 63 63 63...

Страница 64: ...64 64 64 64 64 5621 W 115TH STREET ALSIP IL 60803 PHONE 1 800 433 2545 FAX 1 800 433 2515 E MAIL parts hotwater com www hotwater com REPLACEMENT PARTS...

Отзывы: