10.4
Finalization
To finalize the maintenance, carry out the following steps:
Fill the water heater (see section 7.8.1).
Start the water heater (see section 4.1).
Check the CO
Check the switching pressure of the pressure switch (see section 7.8.5).
Erase the message SERVICE REQUIRED. The displayed message can be reset in
either of two ways:
Temporary reset: To postpone the message, press
RESET
once. The
message will
reappear on the display 7 days later.
Full reset: To fully reset the message, press and hold both
RESET
and
ENTER
at the same
time for 5 sec.
On completion of the full reset of the message, the message below will appear on the
display. This message will NOT be shown after a temporary reset of the message.
1.
2.
3.
4.
5.
-
-
88
Installation, Maintenance and Service part
Содержание BFC Cyclone 120
Страница 6: ...6 ...
Страница 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41 ...
Страница 42: ...42 User part ...
Страница 46: ...46 Installation Maintenance and Service part ...
Страница 52: ...52 Installation Maintenance and Service part ...
Страница 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59 ...
Страница 76: ...76 Installation Maintenance and Service part ...
Страница 78: ...78 Installation Maintenance and Service part ...
Страница 84: ...84 Installation Maintenance and Service part ...
Страница 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part ...
Страница 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part ...
Страница 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part ...
Страница 113: ......
Страница 114: ......
Страница 118: ...116 Installation Maintenance and Service part ...